My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (140)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (140)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
7/26/2011 10:21:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 13.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />1,723 <br />122,946 <br />Total <br />1,723 <br />122,946 <br />• <br />II) Storm Water Management <br />A) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />III) Material Processing <br />A) Drain Cover Fill Process Area <br />No Drain Cover Fill (DCF) was processed during the week. <br />ame$ <br />IV) VLF Geosynthetics <br />A) Geomembrane Installation <br />1) VLF <br />Geomembrane installation within the Phase 5 VLF continued performing deployment, <br />seaming, and repair /QC activities. Geomembrane installation was performed in the area shown <br />on Figure 3. Approximately 111,246 square feet of primary 100mil LLDPE was deployed <br />using a John Deere 200 excavator and a John Deere 544 front -end loader with spreader -bar <br />attachments. Subgrade was inspected and approved by AMEC and Lone Star representatives <br />prior to geomembrane deployment (see Figure 3). Approximately 5,900 linear feet of seam was <br />fusion welded using two fusion welding machines. Thirteen destructive test samples were <br />marked during fusion seaming. All destructive tests performed were within project <br />specifications. Non - destructive testing was performed for fusion welded seams. Repairs were <br />performed using the extrusion welding method for all marked defects. Vacuum testing was <br />performed for all extrusion welded seams and repairs. <br />B) Anchor Trench <br />1) VLF <br />Anchor trench backfill was performed between stations B12+00 ( + / -) and B14+00, between <br />stations C0 +00 ( + / -) and C3 +00 ( + / -) and between stations G30 +00 ( + / -) and G32 +50 ( + / -) <br />using a John Deere 35D excavator and laborers. An AMEC representative observed and <br />inspected the anchor trench backfill. The trench was found to be backfilled in accordance with <br />design drawings and project specifications. <br />C) Geomembrane Acceptance <br />1) VLF <br />After air testing was performed, the geomembrane in the anchor trench was accepted to allow <br />for backfilling (see Figure 4 for previously accepted geomembrane). <br />D) Geomembrane Delivery <br />1) VLF <br />Two loads (22 rolls) of 80mi1 LLDPE single sided textured geomembrane rolls were delivered <br />to site during the shift. The load was delivered on a flat bed truck in good condition. The rolls <br />were unloaded using a CAT 950 front -end loader with forks attached. The geomembrane was <br />placed on three pieces of HDPE pipe, stacked two rolls high. An AMEC field representative <br />VLF Weekly Report WE 09.18.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.