My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (120)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (120)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
7/26/2011 9:58:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 12.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC inspected and approved LVSCF surface for geomembrane deployment within the Phase 5 VLF. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC continuously monitored DCF placement within the Phase 5 VLF. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC observed backfilling of the PSSA anchor trench. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />• No concerns <br />Summary of Planning Items: <br />Continue processing SLF material at the East Cresson Clay Borrow. <br />Continue processing DCF material at the Drain Cover Fill process area. <br />Continue subgrade preparation for SLF placement. <br />Continue SLF placement within the Phase 5 VLF footprint. <br />Continue geomembrane installation within the Phase 5 VLF footprint. <br />Continue high and low volume collection systems. <br />Continue LVSCF placement. <br />Continue DCF placement. <br />Summary of Non - conformances: <br />None Issued <br />amec <br />VLF Weekly Report WE 08.07.10.D.docx <br />