Laserfiche WebLink
Bo* <br />• <br />l <br />I , ; <br />i <br />i £ <br />5 *t#A‘ °-FA:-° , A) 1 $41: WaleX Ill 11/ . <br />. lw <br />0 1 1 : 4 44 1 ---S*4 ‘ : *4* 4 4**%•%***4 4 41* % ** ,k1414*;* *l el * : ^ L <br />: **It *la oio,...,0"," ., <br />,\, <br />0 0 0"9 • � l � � + <br />OO +pi� ,` *. <br />A0, v . <br />O\ <br />,, <br />c <br />c <br />0 <br />CD <br />N <br />it <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, <br />_ PROPOSED GROUND SURFACE CONTOUR EL. FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />.- - - -.._ - EXISTING DRAINAGES <br />i ---- -_ - PREVIOUSLY DEPLOYED LINER <br />i—�.� • DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 52,964 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK. <br />APPROXIMATELY 1.918.803 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />CUM <br />CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />TITLE <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA 100 MIL PRIMARY <br />EARTH AND ENVIRONMENTAL <br />DESIGNED BY <br />DRAWN BY <br />CYT <br />CUT <br />CHECKED BY <br />APPROVED BY <br />JDH <br />JDH <br />DATE <br />08/14/10 <br />CAOD FILENAME <br />FIGURE tb. REV <br />3 I 0 <br />