My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (120)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (120)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:28 PM
Creation date
7/26/2011 9:58:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results 2010, VOL. III, Appendix D, Weekly Reports, Part 12.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E Cresson Clay Processing <br />0 <br />198,028 <br />Processing in area complete. <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />0 <br />430,432 <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />52,107 <br />73,625 <br />Total <br />52,107 <br />73,625 <br />• <br />E) Low Volume Solution Collection System <br />1) Low Volume Solution Collection Piping <br />No work performed during the week. <br />2) Low Volume Solution Collection Fill (LVSCF) <br />No work performed during the week (see Figure 5 for previous LVSCF placement). <br />F) High Volume Solution Collection System <br />1) High Volume Solution Collection Piping <br />Placement of the high volume collection system continued at the DCF placement area shown <br />on Figure 6, advancing in front of the placement. CPeP was placed and sandbagged in <br />accordance with design drawings and project specifications. The primary geomembrane in the <br />area was accepted prior to pipe placement. <br />2) Drain Cover Fill (DCF) <br />DCF placement within the Phase 5 VLF began in the area show on Figure 6. The DCF was <br />hauled from the processing area to the placement area using CAT 740 haul trucks loaded by a <br />CAT 988 front -end loader. The DCF was placed in a 2 -foot lift using a CAT D -6 LGP dozer, a <br />CAT D -7 LGP dozer and a CAT D -8 LGP dozer except where haul routes were established. <br />Haul routes consisted of five -foot lifts to be spread into 2 -foot lifts later. Laborers were present <br />at all times during placement holding the high volume collection piping in place, removing <br />debris /sandbags, and assisting the dozer operator with lift thickness. DCF placement was also <br />performed during night shift using the same equipment and procedures. All DCF was placed <br />on previously approved primary geomembrane. AMEC field representatives monitored the <br />DCF placement constantly. Construction of the pipe corridor at the north toe berm began using <br />additional DCF to create a 15 foot bench. <br />G) Material Processing <br />1) East Cresson Clay Borrow Area <br />Clay processing is complete. <br />ame0 <br />2) Drain Cover Fill (DCF) Processing <br />Processing of DCF material continued this week using a CAT D -9 dozer. <br />VLF Weekly Report WE 08.07.10.D.docx <br />