Laserfiche WebLink
, - - - - <br />Project: <br />Bowie Mine Gob Pile Stability <br />... , - - • - • - - • - ; <br />1 , Clien / On Site Rep: <br />1 ' . GEOTECH i Bowie Resources / B. Bear <br />. <br />. Contractor / Rep: <br />., civil, Structural & Geotechnical Engineers <br />Bowie Resources / Gary Harding <br />222 South Park Ave • Montrose, CO 81401 <br />, <br />Project No: <br />2005126 <br />. • Date: <br />! 4/1/2011 <br />Ph.: (970) 249-6829 - FAX: (970) 249•0945 Technician: <br />CONSTRUCTION MATERIALS TESTING LABORATORY L. Sanchez <br />DAILY COMPACTION REPORT <br />TEST <br />NUMBER <br />LOCATION <br />GRADE ELEV <br />Embankment Gob at the East Bench <br />TEST TYPE <br />MAX DRY <br />DENSITY <br />(Pct <br />OPTIMUM <br />MOISTURE <br />CONT. (%) <br />DRY <br />DENSFIY <br />(pcf) <br />MOISTURE <br />CONTENT <br />(%) <br />PERCENT <br />compAcnoN <br />NOT <br />WITHIN <br />SPEC <br />SOIL <br />TYPE <br />LAB SAMPLE <br />NUMBER ."; <br />NU C <br />SAND <br />424 <br />(PT#4572) N19324.41/E37870.43 6076.1 <br />96.99 <br />10.98 <br />91.38 <br />14.8 <br />94.2 <br />Gob <br />337a/338 r/c@15% <br />425 <br />(PT#4573) N19451.74/E38062.62 6078.0 <br />97.24 <br />10.91 <br />87.87 <br />16.2 <br />90.4 <br />Gob <br />337a/338 r/c@.15% <br />426 <br />(PT#4574) N19489.87/E37822.91 6095.1 <br />95.03 <br />11.59 <br />100.27 <br />9.7 <br />105.5 <br />Gob <br />417/418 r/cC)./10% <br />427 <br />(PT#4575) N19122.04/E37725.59 6043.1 <br />107.91 <br />9.44 <br />99.50 <br />19,6 <br />92.2 <br />Gob <br />331a/334 r/cC).)20% <br />428 <br />(PT#4576) N19095.41/E37642.24 6038.4 <br />HE 103.29 <br />9.82 <br />100.18 <br />13.0 <br />97.0 <br />Gob <br />331a/334 r/c@13% <br />all <br />1111=111111=1111111111 <br />•lIll.IIIIIMIIIIWI <br />11111111M1111.1■11111111=111=1111M1111 <br />IIIIMIMIMIIIIIMMIMIMIIIMIIIMMllIL <br />IIIIIIIIIIIIIIIIIIIIII1MMIII <br />MEM <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING <br />FIELD OBSERVATIONS <br />Specified <br />Compaction 0 Cohesive Soils X Full Time: <br />Date: 4/1/2011 <br />Compaction Equipment Used: <br />1 I <br />Day: <br />111111 <br />u: x <br />1 <br />Sheepsfoot: <br />X <br />90 /o + <br />Requirement: Cohesionless Soils <br />Part Time: <br />Weather: <br />Temp: <br />Wind: <br />Humidibr <br />Sun <br />Clear <br />X <br />Overcast <br />X <br />Rain Snow <br />Smooth Drum Roller: <br />Specified <br />Moisture Cohesive Soils X <br />NA <br />Requ / <br />irement: Cohesionless Soils <br />Number of Site VisitsjDay: <br />To 32 <br />32-50 <br />X <br />50-70 <br />X <br />70-85 <br />85 Up <br />Vibratory: <br />Testing Only: <br />Still <br />X <br />Mod <br />X <br />High <br />Other (List Below): 1 X <br />.---- <br />.Laboratory Testing AsTm Cohesive Soils X <br />Procedure: <br />Cohesionless Soils <br />Requested By (Company Name): <br />Gary Harding / Bowie Resources <br />CAT 815 <br />Dry <br />X <br />Mod <br />Humid <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Insufficient amount <br />Informed (Rep of Company) of Test Results: <br />B. Sear & Gary Harding/Bowie Resources <br />, Bockhorn was not informed prior <br />: to our arrival on site that the <br />contractor would not be working <br />i <br />on this date. <br />' <br />of material placed. <br />Contractor Not Working Due To: <br />The Contractor Is: <br />Field Copies Given To: <br />Contractor: <br />Inclement Weather: <br />Processing Frozi:m Materiel: 1 1- 1Processi n Wet material: <br />' . <br />i <br />Equipment Malfunction: <br />StripOng aredlor crut)bing,: 1 I mo:sture Cooditioning. Dry,Maft: . <br />Client: <br />, PAGE 1 OF 1 , <br />CM/GM: <br />Unknown: <br />Stockpiling Fiii: I <br />Removing Unsuitable Man: <br />Other: <br />05-126-CMT Bowie Mine No 2 Gob Pile Stability CC-S3 7.19.10.xls DCR4-1-11Is#424 <br />