Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: June 28, 2011 <br />Weather Conditions: Clear, 60 to 80 degrees F. <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek —2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Second Quarter 2011 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />GW -10 Alluvium of East Salt Creek south of proposed waste rock disposal area - TD 44.4 <br />Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged @ <br />during gob pile construction. s <br />GW-9 Total Depth 53.5 q << <br />Surface Water <br />Sample <br />Time <br />Flow <br />H <br />(cfs) pH <br />EC <br />umhos /cm <br />Temp (C) <br />p ( ) <br />SW--1 <br />11:20 AM <br />6.10 <br />7.8 <br />1190 <br />16.9 <br />SW-2 <br />11:55 AM <br />Dry <br />- <br />- <br />- <br />SW -3 <br />10:25 AM <br />Dry <br />- <br />- <br />- <br />SW -5 <br />12:00 PM <br />Dry <br />- <br />- <br />- <br />SW-6 <br />10:25 AM <br />Dry <br />- <br />- <br />- <br />SW-T — ` — `1 - 0:25 AM <br />_ <br />Dry <br />- <br />- <br />- <br />SW-8 <br />10:05 AM <br />6.1 <br />7.6 <br />1520 <br />17.6 <br />Ground Water <br />P P <br />ominte <br />Time <br />(feet) <br />pH <br />umhos/cm Temp (C) <br />GW-1 <br />11:00 AM <br />6.9 <br />7.4 <br />2400 <br />15.7 <br />GW-3 <br />10:02 AM <br />38.0 <br />7.1 <br />4300 <br />15.6 <br />GW-6 <br />11:55 AM <br />Dry-18.8' <br />GW -9 <br />11:25 AM <br />25.7 <br />7.0 <br />6500 <br />15.1 <br />GW -10 <br />11:44 AM <br />44.1 <br />Damp <br />McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: June 28, 2011 <br />Weather Conditions: Clear, 60 to 80 degrees F. <br />Location of Points/Wells <br />SW -1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW -3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek —2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW -8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Second Quarter 2011 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW -1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek south of McClane Office - TD 53.5 <br />GW -10 Alluvium of East Salt Creek south of proposed waste rock disposal area - TD 44.4 <br />Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged @ <br />during gob pile construction. s <br />GW-9 Total Depth 53.5 q << <br />