Laserfiche WebLink
Prince Albert Mine 110(d) Permit Application Table of Contents <br />• Exhibit G Source of Legal Right to Enter 15 <br />Exhibit H Municipalities Within a Two Mile Radius 16 <br />Exhibit I Proof of Filing with County Clerk 17 <br />Exhibit J Proof of Mailing of Notices to Board of County Commissioners and Soil Conservation District 18 <br />Exhibit L Permanent Man -Made Structures 19 <br />Exhibit U DMO - Environmental Protection Plan 20 <br />U (1) Environmental Protection Plan Maps 20 <br />U (2) Other Agency Environmental Protection Measures and Monitoring 20 <br />U (2.a) Colorado Stormwater Discharge Permit 20 <br />U (2.b) Colorado Air Pollution Emission Notice for Fugitive Dust 20 <br />U (2.c) MSHA Hazard Communication Program and Site Emergency Response Plan 20 <br />U (3) Other Permits and Licenses 20 <br />U (5) Designated Chemical(s) Evaluation 21 <br />U (6) Designated Chemical(s) and Material(s) Handling 21 <br />U (6.a) Uranium Ore 21 <br />U (6.a.1) Ore Stockpile 21 <br />U (6.a.2) Ore Transportation 22 <br />U (6.a.2a)Reclamation of Ore Storage and Handling Area 22 <br />U (6.b) Mine Waste Rock 23 <br />U (6.b.1) Mine Waste Rock Stockpile(s) 23 <br />• U (6.b.la)Waste Pile Reclamation 24 <br />U (6.b.2) Reclamation of Decline Portal 24 <br />U (6.b.2a)Alternate Reclamation of the Decline Portal 24 <br />U (7) Ground Water 25 <br />U (7.a) Ground Water Information 25 <br />U (7.a.1) Geologic Setting and Stratigraphic Column 25 <br />U (7.a.2) Hydrogeology 26 <br />U (7.b) Ground Water Quality and Management 26 <br />U (8) Surface Water 28 <br />U (8.a) Surface Water Containment and Diversion Structures 28 <br />U (8.b) Surface Water Containment and Diversion Structure Construction Schedule 29 <br />U (8.c) Surface Water Containment and Diversion Structure Construction QA /QC 29 <br />U (8.c.1) Surface Water Containment and Diversion Structure Construction - Critical Phases 30 <br />U (8.d) Reclamation of Surface Water Diversions and Detention Ponds 30 <br />U (8.e) Surface Water Quality and Monitoring Plan 30 <br />U (9) Climate 32 <br />U (10) Geochemical Data 33 <br />U (10.a) Waste Rock Geochemical Analysis 33 <br />U (10.b) Uranium Ore Geochemical Analysis 34 <br />• U (11) Plant Growth Medium and Soil Characteristics 35 <br />Rimrock Exploration & Development ii <br />