My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-20_PERMIT FILE - M2011040
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011040
>
2011-07-20_PERMIT FILE - M2011040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:52 PM
Creation date
7/25/2011 9:26:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011040
IBM Index Class Name
PERMIT FILE
Doc Date
7/20/2011
Doc Name
New 110d application
From
Rimrock Exploration and Development, Inc.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reclamation Task Description <br />(Work Details) <br />I Total Work <br />@ Work Unit <br />I Equipment + Manpower <br />@ Rate <br />I Cost <br />($) <br />Reclaim Roadways [Exhibit D, Sections D (c. l) & D (d) and Exhibit U, Section U (6)) <br />Rip Roadbed <br />( 850 linear ft. x 20 ft. wide ) <br />6 Hours <br />D6 Bulldozer + Operator @ $130.00/hr <br />780.00 <br />Place Topsoil on Roadways <br />(Load & Haul 155 yd @ 250 ft. avg. Distance) <br />6 Hours <br />3 yd Wheel Loader + Operator @ <br />$130.00/hr <br />780.00 <br />Broadcast Seed & Mulch (inc. Borehole Area) <br />( 0.50 Acres Hydroseed & Mulch ) <br />0.5 Acres <br />Fixed Cost @ $1,500.00 /Acre <br />750.00 <br />Reclaim Waste Rock Piles {Exhibit D, Section D (d) and Exhibit U, Section U (6.b.1a)) <br />Final Contour yd3 Waste Pile <br />(Grade /Shape 1,000 yd of Waste Rock 150 ft) <br />12 Hours <br />D6 Bulldozer + Operator @ $130.00/hr <br />1,560.00 <br />Place Topsoil - Primary Waste Pile <br />(Load/Haul /Spread 805 yd @ 250 ft. Dist.) <br />10 Hours <br />10 Hours <br />Loader /25T Truck + Op. @ $175.00/hr <br />D6 Bulldozer + Operator @ $130.00/hr <br />1,750.00 <br />1,300.00 <br />Final Contour - Secondary Waste Pile <br />(Grade /Shape 500 yd of Waste Rock 100 ft) <br />6 Hours <br />D6 Bulldozer + Operator @ $130.00/hr <br />780.00 <br />Place Topsoil - Secondary Waste <br />( Push & Spread 485 yd @ 75 ft. Distance) <br />6 Hours <br />D6 Bulldozer + Operator @ $130.00/hr <br />780.00 <br />Broadcast Seed & Mulch Waste Piles <br />( 1.6 Acres Hydroseed & Mulch ) <br />1.6 Acres <br />Fixed Cost @ $1,500.00 /Acre <br />2,400.00 <br />Reclaim Decline Portal {Exhibit D, Section D (d) and Exhibit U, Section U (6.b.2)) <br />Backfill Decline Portal Cut <br />(Push 1,000 yd3 - 150 ft. from Primary Waste) <br />12 Hours <br />D6 Bulldozer + Operator @ $130.00/hr <br />1,560.00 <br />Reclaim Ore Storage and Handling Area {Exhibit D, Section D (d) and Exhibit U, Section U (6.a.2a)) <br />Clean Up Uranium Ore Residuals <br />( Remove Residual Ore & Wash Pad Down) <br />8 Hours <br />Skidsteer + Water Truck + Operator @ <br />$135.00/hr <br />1,080.00 <br />Clean Uranium Ore Sediments from Sump <br />2 Hours <br />Skidsteer + Operator @ $85.00/hr <br />170.00 <br />Backfill Ore Stockpile & Sump Area <br />(Push 1,000 yd -150 ft. from Secondary Pile) <br />12 Hours <br />D6 Bulldozer + Operator @ $130.00/hr <br />1,560.00 <br />Place Topsoil - Ore Pad & Decline <br />(Load/Haul /Spread 275 yd @ 175 ft. Dist.) <br />4 Hours <br />4 Hours <br />Loader /25T Truck + Op. @ $175.00/hr <br />D6 Bulldozer + Operator @ $130.00/hr <br />700.00 <br />520.00 <br />Broadcast Seed & Mulch <br />( 0.4 Acres Hydroseed & Mulch ) <br />0.4 Acres <br />Fixed Cost @ $1,500.00 /Acre <br />600.00 <br />Reclaim Ventilation Borehole [Exhibit D, Section D (c.2) & Section D (d)) <br />Dismantle & Remove Vent Structures <br />Remove Vent Equipment & Borehole Casing <br />8 Hours <br />Loader + Op. + Laborer @ $170.00/hr <br />1,360.00 <br />Seal Borehole <br />( Conventional Steel & Concrete Seal ) <br />1 Unit <br />Fixed Cost per Plug @ $7,500.00 <br />7,500.00 <br />Place Topsoil - Borehole Location <br />(Load/Haul /Spread 100 yd @ 100 ft. Dist.) <br />4 Hours <br />3 yd Wheel Loader + Operator @ <br />$130.00/hr <br />520.00 <br />Reclaim Water Drop [Exhibit D, Section D (c.3) & Section D (d)) <br />Rip & Seed Area <br />1 Hours <br />D6 Bulldozer + Operator @ $130.00/hr <br />130.0 <br />Reclaim Surface Water Control & Containment Structures [Exhibit D, Section D(d) & Exhibit U, Section U (8.14 <br />Flatten Swales to 4H:1V & Pond Banks to 3H:1V <br />16 Hours <br />Track Hoe + Operator @ $200.00/hr <br />3,200.00 <br />Plug Monitoring Wells <br />2 Units <br />Track Hoe + Op @ $250.00 /unit <br />500.00 <br />Place Topsoil - Surface Water Controls <br />(Load/Haul /Spread 1,000 yd @ 250 ft. avg.) <br />12 Hours <br />>see T -Hoe above <br />Loader /25T Truck + Op. @ $175.00/hr <br />Track Hoe + Operator @ $200.00/hr <br />2,100.00 <br />Broadcast Seed & Mulch <br />( 1.0 Acres Hydroseed & Mulch ) <br />1.0 Acres <br />Fixed Cost @ $1,500.00 /Acre <br />1,500.00 <br />Remove Underground and Surface Equipment & Structures {Exhibit D, Section D (c31) & Section D (d)} <br />Remove All Equipment & Structures from Site <br />16 Hours <br />16 Hours <br />Tractor/Flat Bed + Op. @ $175.00/hr <br />Boom Trk + Op + Labor @ $160.00/hr <br />2,800.00 <br />2,560.00 <br />Total Cost of all Tasks <br />39,240.00 <br />Reclamation Cost Estimate By Task <br />Figure D.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.