My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-20_PERMIT FILE - M2011040
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011040
>
2011-07-20_PERMIT FILE - M2011040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:52 PM
Creation date
7/25/2011 9:26:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011040
IBM Index Class Name
PERMIT FILE
Doc Date
7/20/2011
Doc Name
New 110d application
From
Rimrock Exploration and Development, Inc.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prince Albert Mine 110(d) Permit Application Exhibit D <br />D (e) Reclamation Costs <br />A summary table of the estimated costs associated with the reclamation of the Prince Albert Mine site is <br />provided in Table D.3 "Summary Reclamation Cost Estimate" below. A more detailed breakdown of <br />estimated costs by task is included as Exhibit D, Figure D.1 "Reclamation Cost Estimate by Task." <br />Descriptions of the work to be performed for each reclamation task noted in Figure D.1 can be found in <br />the sections noted. <br />This reclamation cost is very conservative and a planning estimate only based on a third -party contractor <br />performing the work. Actual costs are anticipated to be 25% to 50% lower since some reclamation work <br />will be performed on an ongoing basis during the mining operation, particularly with regards to the waste <br />pile reclamation. Note that the seeding cost/acre assumes that 50% of the areas will have to be reseeded. <br />The final reclamation costs used to set the reclamation bond will be calculated by the DRMS, using an <br />industry- standard cost estimating program, once that agency has reviewed the Reclamation Plan prior to <br />issuing a Limited Impact 110(d) Reclamation Permit. <br />Table D.3 <br />Summary Reclamation Cost Estimate <br />Figure D.1 Task Roll -up Total Task Roll -up Cost <br />Reclaim Roadways <br />Reclaim Waste Rock Piles <br />Reclaim Decline Portal <br />Reclaim Ore Storage and Handling Area <br />Reclaim Ventilation Borehole <br />Reclaim Water Drop <br />Reclaim Surface Water Control & Containment Structures <br />Remove Underground & Surface Equipment and Structures <br />2,310.00 <br />8,570.00 <br />1,560.00 <br />4,630.00 <br />9,380.00 <br />130.00 <br />7,300.00 <br />5,360.00 <br />Task Roll -up Total $39,240.00 <br />Administration @ 10% 3,924.00 <br />Contingency @ 15% 6,475.00 <br />Reclamation 3 Party Cost Total $49,639.00 <br />DRMS Administration Cost @ 5% 2,482.00 <br />Total Reclamation Cost Estimate $52,121.00 <br />Rimrock Exploration & Development Page 13 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.