Laserfiche WebLink
Description <br />Months <br />Access and mine the Prince Albert ore deposit. <br />120.0 <br />Post - Mining Site Reclamation <br />Reclaim the Ore Pad Area <br />0.25 <br />Reclaim the Prince Albert Decline Portal <br />0.25 <br />Reclaim the Ventilation Shafts (concurrent with Prince Albert Portal <br />Closure) <br />0.75 <br />Dismantle and Remove Structures <br />0.50 <br />Reclaim Storm Water Diversions and Structures (Concurrent with Waste <br />Pile Reclamation) <br />(0.25) <br />Reclaim Waste Piles <br />0.50 <br />Rip the Prince Albert Portal Area and Site Access Roads <br />0.25 <br />Place Topsoil and Harrow <br />0.50 <br />Seed and Mulch <br />0.50 <br />Monitor Vegetation and Re -seed, as necessary (based on the standard <br />DRMS monitoring period of three years). <br />36.0 <br />Total Reclamation Period (months) <br />39.5 <br />Prince Albert Mine 110(d) Permit Application Exhibit D <br />EXHIBIT D RECLAMATION PLAN <br />Exhibit D to the Prince Albert Mine 110(d) permit application describes the post- mining land use, site <br />reclamation timetable, location specific reclamation of site features that are not related to toxic materials, <br />and a conservative reclamation cost estimate associated with returning the affected lands to the post - <br />mining land use. A map of the site that depicts the post - reclamation features of the site is attached as <br />Exhibit E, Figure E.2 "Reclamation Plan Map." <br />A detailed discussion of the reclamation required for each specific location on the site that may be <br />affected by toxic, or potentially toxic, materials is included in the Exhibit U "Environmental Protection <br />Plan (EPP)." <br />D (a) Post Mining Land Use <br />The Prince Albert Mine site will be reclaimed as dry rangeland and wildlife habitat. <br />D (b) Reclamation Timetable <br />A timetable for the commencement and completion of reclamation is provided below. Reclamation under <br />this plan is not staged and occurs at the end of the mine life. <br />Table D.1 — Prince Albert Reclamation Timetable <br />Rimrock Exploration & Development <br />Page 9 of 39 <br />