My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-19_PERMIT FILE - P2011023
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011023
>
2011-07-19_PERMIT FILE - P2011023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:50 PM
Creation date
7/22/2011 7:26:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011023
IBM Index Class Name
PERMIT FILE
Doc Date
7/19/2011
Doc Name
New NOI application (form 2)
From
Rio Grande Silver, Inc.
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil depth is estimated to range from zero to 12 inches locally. Where present, topsoil <br />will be salvaged and stockpiled adjacent to drill pads and roads. Once drill pads and roads <br />are recontoured and scanted, the salvaged topsoil will be redistributed over the final <br />availahle fnr rfariiktrihution as a growing medium <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Drill holes will be abandoned in their entirety upon completion of each drill hole. All drill holes <br />will be completely filled with abandonite, and or, bentonite, cement grout or concrete to <br />- . - • • - <br />. • - - I • . I OTT. - V/ <br />- <br />Ty- <br />.- <br />post exploration danger to people and wildlife that may traverse the area. The abandonitc, <br />and or. bentonite, grout or concrete will be placed "bottom -up" in each drill hole. A 10 to 20 <br />foot cement plug will cap each drill hole. The plug will ensure that any settlement of the <br />abandonite, bentonite, grout or concrete in the hole will not affect the long -term effectiveness <br />• . - . T . - . ... . . • .. •. • rr . . .. ..- - . <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Not Applicable <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />Gates will be left in place or installed at the entrance to the temporary, low- standard <br />access roads to close them to motorized travel at the conclusion of the exploration <br />program. Disturbed areas (roads and drill pads) will be returned back to the contour and <br />topography present prior to the proposed disturbance. Compacted areas will be loosened <br />reseeded. Reclamation will include the installation of water bars where necessary to <br />prevent degradation of the reclaimed area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.