Laserfiche WebLink
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />- <br />D = Day Shift N = Night Shift <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: July 2, 2011 <br />Reporting Period: 6/26/11 through 7/02/11 <br />Ambient Temperature Range (F): <br />Low: 44 °F to 56 ° F ( + / -) <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />amee) <br />High: 64 °F to 85 °F ( + / -) <br />AMES/Lonestar: Work activities were paused after the shift on Friday (7/1/2011) in observance of the <br />Independence Day holiday. Work activities are scheduled to resume on Wednesday (7/6/2011). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Subgrade acceptance was not performed during the week. Previous subgrade acceptance is <br />shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring performed between stations H6 +00 ( + / -) and H11 +00 ( + / -), approximately 0 <br />to 400 feet right of centerline. Slope contouring was performed using a CAT D -6 LGP dozer. <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 07.02.2011 <br />