Laserfiche WebLink
1.0 EXECUTIVE SUMMARY — Interim Status <br />American Soda, L. L. P. (a wholly owned subsidiary of Solvay Chemicals) is submitting <br />this 2010 -2011 Annual Report in compliance with C.R.S. 34 -32- 116(3) Colorado Mined <br />Land Reclamation Act. <br />(3) On the anniversary date of the permit each year, the operator shall submit a report and a map <br />showing the extent of current disturbances to affected land, reclamation accomplished to date and <br />during the preceding year, new disturbances that are anticipated to occur during the upcoming <br />year, and reclamation that will be performed during the upcoming year. <br />The anniversary date for 112 Permit No. M- 1999 -002 American Soda Yankee Gulch <br />Sodium Minerals Project is July 13, 2011. Prior to the submittal of this document a <br />check for payment to the Division for the Annual Permit Fees in the amount of $1,150 <br />was sent by our accounts payable department and received by your office. <br />This document provides a summary of the surface disturbance and reclamation <br />performed during the current reporting period from July 13, 2010 to July 12, 2011, as <br />well as planned disturbance and reclamation for the next reporting period. Activities at <br />the Yankee Gulch Project during the reporting period were conducted under the <br />regulatory guidance and inspection oversight of the Colorado Division of Reclamation, <br />Mining, and Safety (DRMS) under 112 Permit No. M- 1999 -002. <br />A major component of this document is the Well Field Status Map which identifies <br />areas where disturbance and reclamation may have occurred during the report period. <br />In addition to the current status of the 0 — 5 year mining panel the Well Field Status <br />Map also provides a general regional location map of the American Soda Piceance Site <br />Mining Operation on the map insert in the lower left corner. <br />Section 2.0 of this report addresses permit modifications for the Yankee Gulch Project <br />during the 2010 — 2011 permit period. <br />Section 3.0 addresses the status of American Soda's project operations, including the <br />extent of current disturbances and reclamation and any disturbance or reclamation <br />activity planned for 2011 — 2012. <br />American Soda, L.L.P. <br />DRMS Annual Report <br />July 7, 2011 <br />1 <br />