My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-12_REPORT - M1999002
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1999002
>
2011-07-12_REPORT - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:36 PM
Creation date
7/21/2011 9:19:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
REPORT
Doc Date
7/12/2011
Doc Name
Annual report
From
American Soda, LLP
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Certification Form — Verified and Signed <br />TABLE OF CONTENTS <br />1.0 EXECUTIVE SUMMARY — Interim Status <br />1 <br />2.0 PERMIT MODIFICATIONS <br />2 <br />3.0 STATUS OF PROJECT OPERATIONS (2010 -2011) <br />3.1 Current Status /Activities 3 <br />3.2 Reclamation of Disturbed Areas Summary 4 <br />3.3 Planned Disturbances /Reclamation for 2010/2011 12 <br />LIST OF TABLES <br />TABLE 1 — SOLUTION MINING WELLS STATUS JULY 2011 3 <br />TABLE 2 — DISTURBED AND RECLAIMED AREAS WITHIN DIVISION OF <br />RECLAMATION, MINING AND SAFETY PERMIT BOUNDARY 5 <br />TABLE 3 — STATUS AND RECLAMATION DETAIL FOR WELL PADS AND <br />ROADS 7 <br />LIST OF PHOTOS <br />PHOTO 1 — Panoramic view of Piceance Creek mid August 2010. 2 <br />PHOTO 2 — Yellow blooming wild flower on rocky slope of production well 7 <br />pad. <br />PHOTO 3 - View from solution mining well pad looking up Horse Draw. 12 <br />PHOTO 4 — Equipment in use during MIT testing of production well. 13 <br />PHOTO 5 - Crane, injector head, and coil tubing mobilize to production well. 14 <br />PHOTO 6 — A water truck backs into place while the crane lifts the injector 15 <br />head over well 29 -34. <br />PHOTO 7 — Cement plugging of well 29 -34 in progress. 16 <br />PHOTO 8 - Close -up of injector head suspended over production well 29 -34. 17 <br />PHOTO 9 — Nitrogen used to clean out coil tubing and injector head. 18 <br />PHOTO 10 — End of a long and successful day. 19 <br />LIST OF MAPS <br />WELLFIELD STATUS MAP JULY 2011 - YANKEE GULCH SODIUM MINERALS Map <br />PROJECT Pocket <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.