Laserfiche WebLink
Certification Form — Verified and Signed <br />TABLE OF CONTENTS <br />1.0 EXECUTIVE SUMMARY — Interim Status <br />1 <br />2.0 PERMIT MODIFICATIONS <br />2 <br />3.0 STATUS OF PROJECT OPERATIONS (2010 -2011) <br />3.1 Current Status /Activities 3 <br />3.2 Reclamation of Disturbed Areas Summary 4 <br />3.3 Planned Disturbances /Reclamation for 2010/2011 12 <br />LIST OF TABLES <br />TABLE 1 — SOLUTION MINING WELLS STATUS JULY 2011 3 <br />TABLE 2 — DISTURBED AND RECLAIMED AREAS WITHIN DIVISION OF <br />RECLAMATION, MINING AND SAFETY PERMIT BOUNDARY 5 <br />TABLE 3 — STATUS AND RECLAMATION DETAIL FOR WELL PADS AND <br />ROADS 7 <br />LIST OF PHOTOS <br />PHOTO 1 — Panoramic view of Piceance Creek mid August 2010. 2 <br />PHOTO 2 — Yellow blooming wild flower on rocky slope of production well 7 <br />pad. <br />PHOTO 3 - View from solution mining well pad looking up Horse Draw. 12 <br />PHOTO 4 — Equipment in use during MIT testing of production well. 13 <br />PHOTO 5 - Crane, injector head, and coil tubing mobilize to production well. 14 <br />PHOTO 6 — A water truck backs into place while the crane lifts the injector 15 <br />head over well 29 -34. <br />PHOTO 7 — Cement plugging of well 29 -34 in progress. 16 <br />PHOTO 8 - Close -up of injector head suspended over production well 29 -34. 17 <br />PHOTO 9 — Nitrogen used to clean out coil tubing and injector head. 18 <br />PHOTO 10 — End of a long and successful day. 19 <br />LIST OF MAPS <br />WELLFIELD STATUS MAP JULY 2011 - YANKEE GULCH SODIUM MINERALS Map <br />PROJECT Pocket <br />i <br />