My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-12_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2011-07-12_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:51 PM
Creation date
7/21/2011 9:18:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
7/12/2011
Doc Name
Slope stability evaluation (TR-03)
From
The Union Milling Company
To
DRMS
Type & Sequence
TR3
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CTL/THOMPSON, INC. <br />CONSULTING GEOTECHNICAL AND MATERIALS GINEERS <br />April 10, 1990. <br />Mr.. Don Wilson <br />Leadville Mining & M.iUing .Corporotlori <br />700 Carr Street <br />Lakewood, Colorado 80215 <br />Subject: Permeability Study <br />Tailing Pond Area <br />Leadville Mining & Milling Corporation Mill <br />Near Leadville, Colorado <br />Job No. 16,768 <br />Dear Mr. Wilson: <br />Very truly yours, <br />CTL/THOMPSON, INC. <br />Frank J. Holliday, P. E. <br />Principal Engineer <br />FJH:dd <br />I copy sent w/enclosures <br />Please find enclosed (a) five copies of our report for our permeability study, <br />(b) five copies of our letter regarding the installation of the observation hole <br />required by Lake County, (c) a copy of the State perrnit for the observation hole <br />•and (d) a copy of the letter to the State showing the summery log and construction <br />of the observation hole they require. <br />Note the last line of the first paragraph of the State perrnit letter requires <br />the observation hole be plugged or permanently permitted within one year It <br />takes several weeks to get a permanent permit which would have held up placing <br />the hole, therefore, we choose to notify the State of the construction of the <br />hole. We are available to help Leadville Mining & Milling Corporation to <br />permanently permit the observation hole, if desired. <br />Thank you for retaining our firm for the permeability study. Please call <br />when we can be of further service. <br />1.97i 'WEST ,7-eTt-1 E E . DENVER COLOP,A DO EQ Qoa) 8Q7 7 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.