Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />Ola <br />02a <br />03a <br />Seal drill holes <br />BOREHOLE <br />■■•■•■■ 1•••••q <br />75.00 <br />$42,569.55 <br />$865.34 <br />$2,026.86 <br />Revegetate 15 drill pads (25' x 50') <br />REVEGE <br />10.00 <br />Mobilize reclamation crew /equipment <br />MOBILIZE <br />4.22 <br />SUBTOTALS: <br />89.22 <br />$45,461.75 <br />Task description: <br />Site: Maybell <br />Reclamation cost summary <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 7/14/2011 County: Moffat <br />User: DMC <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />COST SUMMA] <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $918.33 <br />Performance bond: 1.05 Total = $477.35 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $4,546.18 <br />TOTAL O & P = $5,941.86 <br />CONTRACT AMOUNT (direct + 0 & P) = $51,403.61 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 <br />Permit Action: Initial Bond Permit/Job #: P2011019 <br />Abbreviation: None <br />Filename: P019 -000 <br />Total = <br />Total = <br />500.00 <br />$0.00 <br />$2,570.18 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $9,012.04 <br />TOTAL BOND AMOUNT (direct + indirect) = $54,473.79 <br />ROUNDED TO $54, 500.00 <br />