Laserfiche WebLink
permit <br />2 <br />3. The proposed mining and reclamation operations can be carried out in conformance <br />requirements of the Act, and the Construction Material Rules and Regulations. <br />E. The Permittec has made a showing satisfactory to the Board: 1) that it will employ, during and a: . <br />underground mining and/or surface operations, procedures designed to minimize environmental disturbance from _u=: <br />operation; 2) that it will provide for reclamation of the Affected Lands appropriate to thc subsequent beneficial <br />such lands; and 3) that, in the event of the failure of its proposed � by such operations i with the Act. may b, <br />necessary to assure the success of reclamation of the lands Y <br />F. A copy of the Pcrrmittce's application, as amended and supplemented, has been approved by the Roar( <br />and is, by this reference, incorporated herein. <br />C. The issuance of this permit does not relieve the Permittee from having to comply with all applicabl <br />Federal, State and County statutes, including State water law. <br />GRANIS,_CONDITIONS AND AGREEMENfs <br />The Board, in reliance upon the representations and promises made in the permit application, as amended ni <br />supplemented, and the performance warranty, hereby issues a life of the mine permit to the Permittee, to engage in di <br />operations described in the application on certain lands lying in the Coaunt�fe cd to hcr State <br />ein as the Affected Lands" <br />S ar <br />described in the permit application, as amended and supplemented, and are <br />This permit is issued subject to the following conditions and agreements: <br />1) The Perrnittce will be bound by all applicable requirements of thc Act, and all applicable rules an <br />regulations of the Board, as amended from time to time, the terms of the permit application, the terms of the performanc <br />warranty, and the terms of the financial warranty filed with the Division. <br />2) The Permittee will file with the Division its annual report and fees on each anniversary date of thi <br />3) If analyses of the mining and reclamation operation and the data collected through monitoring an <br />experimentation by the Permittec or monitoring by the Division indicate that the operation will not be able to compl <br />with thc requirements of the Act and applicable rules and regulations of thc Board, thc Pcrmittee hereby agrees t <br />exercise its best efforts, after consulting with the Division, to modify the plans to correct such deficiencies in the futon <br />Such modifications may require technical revisions or amendments to the permit. <br />4) The Board, or its authorized representative may enter upon the lands of the permitted operation at a <br />reasonable times for the purpose of inspection to determine whether the provisions of the Act, Rules and Regulations, an <br />permit have been complied pursuant to C.R.S. 34-32.5 -121. <br />5) This permit may be revoked or suspended for non-compliance with the Act or applicable rules <br />regulations promulgated by the Board, the permit, or by violation of a Board Order. <br />b) a) • Pursuant to 34-32.5- 118(5) of the Act, the Board has right f entry to reclaim the lane <br />affected by the operation, or to respond to an emergency as defined by C.R.S. 34-32.5-121(2). <br />