My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-01_PERMIT FILE - C1982057A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057A
>
2011-07-01_PERMIT FILE - C1982057A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:08 PM
Creation date
7/15/2011 8:24:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
7/1/2011
Doc Name
Shrub Plot Slide Remediation Plan
Section_Exhibit Name
Tab 20 Attachment 20-D
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conclusions and Recommendations: Based on the groundwater measurements and observations made at the site <br />during 2008, 2009 and 2010, and our discussions with Seneca regarding possible solutions for dewatering and <br />stabilizing the landslide areas, NWCC has developed the following plans for reducing groundwater seepage into the <br />failure /landslide areas, as well as site grading recommendations for reconstructing/regrading the failed areas to more <br />stable configurations. <br />Pond 016 Landslide: As stated in our original report, NWCC believes that groundwater flowing within the <br />weathered/highly fractured claystone materials is daylighting within the overburden soils and fills materials resulting in <br />the slope failure. This groundwater must be intercepted and directed away from the failed areas to improve slope <br />stability. Based on the information obtained from the test pit/trenches excavated in 2009, it does not appear that it will <br />be feasible to construct trench drains within the existing fill materials and overburden soils without laying <br />back/constructing these materials to a flatter and more stable configuration. NWCC believes that the competent <br />bedrock materials at the site can be safely excavated to a 0.5 (Horizontal) to I (Vertical) slope configuration; however, <br />the overburden soils and highly weathered bedrock materials should be excavated to slope configurations of 2 <br />(Horizontal) to I (Vertical) or flatter. <br />Based on our discussions with Seneca, a plan has been developed that will consist of the removal of the failed materials <br />along the northern half of the slide area and then constructing rock drains at the base of the excavation and in the <br />competent bedrock materials. Fill materials will be placed over the rock drains so that adequate road grade can be <br />maintained for the property owners. The approximate location of this excavation and drains (A -A') is shown in the <br />Pond 016 Area Remediation Plan and Road Profile, Exhibit No. 20 -D.2, Sheet I of 2 and the cross sections for this area <br />are shown in the Pond 16 Area Remediation Plan and Post Mine Cross Section, Exhibit No. 20 -D.2, Sheet 2 of 2, which <br />are provided in Appendix C. <br />It is NWCC's opinion that removal of saturated fill materials, overburden soils and weathered/highly fractured <br />claystone materials from the upper portion of the failure will significantly reduce the driving forces contributing to the <br />failure condition. We also believe that a rock drains and open channels constructed within the competent bedrock <br />materials should significantly improve the subsurface drainage conditions at the site and help stabilize the lower <br />portion of the failed area. <br />Due to the amount of groundwater seepage that has been encountered at the site, NWCC recommends that the drainage <br />collection system be installed at the base of the cut slope excavated into the competent bedrock materials. The base of <br />the drain should be at least 5 feet in width. The drainage system should consist of free draining gravels and cobbles. <br />NWCC recommends that free draining gravels consist of screened gravels and cobbles ranging from 3 to 6 4 inches in <br />size and containing less than 5 percent passing the No. 200 sieve. Details for the proposed drainage system are shown <br />on the plan provided in Pond 016 Area Remediation Plan and Road Profile, Exhibit No. 20 -D.2. Sheet I of 2 in <br />Appendix C. Depending on the amount of groundwater flow encountered in the base of the excavation, the use of <br />perforated, 6 -inch diameter PVC pipe (SDR -35) surrounded with gravels ranging from 3/8 to 3 inches in size may be <br />required. <br />The actual depths and finished configurations for the cut slopes and drains, and trenches should be determined in the <br />• field as the groundwater and bedrock conditions are exposed and can be observed. In addition, the details and <br />Job Number: 09 -8099 NWCC, Inc. Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.