My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-14_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2011-07-14_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:41 PM
Creation date
7/14/2011 1:39:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REPORT
Doc Date
7/14/2011
Doc Name
2nd Quarter 2011 West Pit Fill Report & 2nd Quarter 2011 South Taylor Fill Report
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />July 14, 2011 <br />Mr. Tony Tennyson <br />Environmental Engineer <br />Colowyo Coal Company <br />5731 Highway 13 <br />Meeker, CO 81641 <br />RE: Colowyo Coal Mine, C1981 -019, 2011 Second Quarter West Pit Fill Report, and 2011 Second <br />Quarter South Taylor Fill Report <br />Dear Mr. Tennyson: <br />The Division received Colowyo Coal Company's (CCC) 2011 Second Quarter West Pit Fill Report, and <br />2011 Second Quarter South Taylor Fill Report on June 21, 2011. Submittal of these reports is in <br />compliance with Rule 4.09.1(11)(b). <br />South Taylor Fill: <br />Inspection by a registered engineer, Mr. Thomas Peterson, occurred on June 20, 2011. A -A' underdrain <br />construction is reported to be complete. The operator is in the process of placing fill over the A -A' <br />underdrain. B -B' underdrain is complete, and fill has been placed over the drain. C -C' underdrain is <br />complete. C -C' drain has been covered with spoil. At the C -C' area bench 7800, and bench 7850 are <br />completed, while bench 7900 and bench 7950 continue to receive fill material. No structural problems were <br />identified in the second quarter report. <br />This inspection is in compliance with Rule 4.09.1(11)(a) and (b). <br />West Pit Fill: <br />Office of <br />Mined Land Reclamation <br />STATE OF COLORADO <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />Inspection by a registered engineer, Mr. Thomas Peterson, occurred on June 20, 2011. No new material was <br />placed on the West Pit fill during second quarter 2011. Two locations of water flow were noted in the <br />report. The first was approximately 2 gallons per minute from the toe of the West Pit underdrain. The <br />second location recorded less than 2 gallons per minute near the toe of the fill and its intersection with the <br />West Pit pond road. No structural problems were identified in the second quarter report. <br />Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.