Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />July 13, 2011 <br />Tonia M. Perkins, P.E. <br />Trapper Mining, Inc <br />P.O. Box 187 <br />Craig, CO 81626 <br />Sincerely, <br />Robert Zuber, P.E. <br />Environmental Protection Specialist <br />Office of <br />Mined Land Reclamation <br />STATE OF COLORADO <br />No problems or maintenance items were noted during the inspection of the Horse Gulch Excess Spoil Fill. <br />If you have any questions feel free to contact me. (303) 866 -3567, extension 8113. <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />—&— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />RE: Trapper Mining, Inc., Permit C- 1981 -010 <br />Second Quarter 2011 - Horse Gulch Fill Quarterly Inspection Report <br />Dear Ms. Perkins <br />The Colorado Division of Reclamation, Mining, and Safety (CDRMS) has reviewed and found the above referenced <br />report to be in compliance with the following CDRMS regulations: <br />4.09.1(11)(a) Inspected at least quarterly by a reregistered engineer or other qualified professional specialist in <br />construction of earth and rockfill embankments under the direction of a qualified engineer <br />throughout the construction <br />The certified report covers the second quarter monitoring period from April to June 2011, and the <br />inspections were conducted by yourself, a certified engineer. <br />4.09.1(11)(b) Provide to the Division a certified report within 2 weeks after each inspection that the fill has been <br />constructed as specified in the design approved by the Division, The report shall include a <br />description of any appearances of instability, structural weakness, and other hazardous conditions. <br />The inspection was conducted on June 30, 2011, and the report was received by the Division on July <br />7, 2011. No instability, structural weakness, or other hazardous conditions were noted during this <br />inspection. <br />Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />