Laserfiche WebLink
Shell Frontier Oil & Gas Inc. <br />FINANCIAL WARRANTY CALCULATION <br />SUBSURFACE RECLAMATION COSTS <br />Site: East RDD Pilot Project Date: July 12, 2011 <br />Task no.: 10 <br />Lab analytical costs: <br />Analytical suite <br />I Cost <br />JSuite description <br />BETX <br />BETX <br />$56 <br />Benzene <br />$56 <br />Included as part of BTEX analysis <br />BETX + selected metals, inorganics & semi -VOA's <br />Expanded <br />$420 <br />Temperature <br />$0 <br />NA - temperature monitoring transducer only <br />Assumptions: <br />1 - Natural cooling of the pyrolyzed reservoir is expected to take 2 years after cessation of production. <br />2- Two years of reservoir temperature monitoring necessary during post - production cooling phase. <br />3- Five years of ground water monitoring at pad 138 -4 -298. Includes two years of initial monitoring during <br />post - production cooling phase followed by three years of additional monitoring required to demonstrate <br />compliance with ground water quality standards. <br />4- Reservoir voids filled with water using SFOGI -owned water hauled from private well in Corrral Gulch. <br />Monitoring costs: <br />Manpower: Operator: $50,000 Per technician per year <br />0.5 1/2 time technician <br />$25,000 Total per year <br />O & M: Pumps & controllers: $35,000 Monitoring well pumps & equipment <br />Electricity (portable generator): $6,424 Power for well pump operation only <br />Waste disposal: $10,000 Waste water from monitoring wells only <br />Reporting: $25,000 <br />$76,424 Total per year <br />Monitoring: YEAR # WELLS PARAMETERS # SAMPLES/YR COST/YR <br />Observer wells: 1 6 Temperature 4 $0.00 <br />2 6 Temperature 4 $0.00 <br />Hydrology pad 138 -4 -298: 1 5 Expanded 4 $8,400.00 <br />2 5 Expanded 4 $8,400.00 <br />3 5 BTEX 2 $560.00 <br />4 5 BTEX 2 $560.00 <br />5 5 BTEX 2 $560.00 <br />Reservoir filling costs: Water truck - 3,500 gal. capacity: <br />Cost of water *: $0.00 /gal. Total gallons: 378,000 Total water cost: $0.00 <br />Cost of hauling *: $57.96 /hour Gallons /load: 3,500 Hours /load: 1.00 <br />Total hauling time (hours): 108.00 Total hauling cost: $6,259.75 <br />Total reservoir filling cost: $6,259.75 <br />* Water hauled from SFOGI -owned well in Corral Gulch using diesel powered on- highway water truck. <br />Total job cost: YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 FILL RESERVOIR <br />$109,824 $109,824 $101,984 $101,984 $101,984 $6,260 <br />Total: $531,861 <br />P- 2010 -026 bondcalc 01 a Page 16 of 17 <br />