Laserfiche WebLink
P- 2010 -026 bondcalc 01a Page 8 of 17 <br />Shell Frontier Oil & Gas Inc. <br />FINANCIAL WARRANTY CALCULATION <br />DOZER WORK <br />Site <br />East RD &D Pilot Project <br />Date July 12, 2011 <br />Task no. <br />4 <br />Task <br />Regrade site (excluding pond and access road) <br />Equipment <br />Base model: <br />Cat D8T - SU <br />Blade type: <br />Semi - Universal <br />Blade width (ft.): <br />12.92 <br />Attachment: <br />Multi -shank ripper Type: Adjustable parallelogram <br />State: Colorado <br />County: Rio Blanco <br />Labor zone: <br />2 <br />Hourly cost <br />Ownership: $65.03 <br />Horsepower: <br />310 <br />Operating - dozer: <br />$90.05 Utilization: 100% $90.05 <br />Weight- dozer: <br />42.43 <br />Operating - ripper: <br />$6.19 Utilization: 0% $0.00 <br />- blade: <br />5.28 <br />Operator: $38.32 <br />- ripper: <br />5.37 <br />Total: $193.40 <br />Total (UST): <br />53.08 <br />Volume <br />30,718 CCY <br />Swell: 1.123 Final: <br />34,485.30 <br />LCY <br />Material description: <br />Decomposed rock - 25% Rock, 75% Earth <br />Derivation: Assume 2 ft. layer regraded over disturbed area (9.52 ac.) <br />Production <br />Average push distance: <br />150 feet <br />Unadjusted production: <br />634.3 LCY /hr* per Caterpillar Performance Handbook Edition: <br />39 <br />JOB CONDITION CORRECTION FACTORS* <br />FACTOR* <br />Material consistency: <br />Compacted fill or embankment <br />0.900 <br />Operator skill: <br />Average <br />0.750 <br />Dozing method: <br />General <br />1.000 <br />Visibility: <br />Average daytime conditions <br />1.000 <br />Job efficiency: <br />1 daytime shift per day (50 min. hour) <br />0.833 <br />Spoil pile: <br />Finish dressin - rough finish <br />0.800 <br />Push gradient: <br />5.00% os. grade = uphill push; neg. = downhill <br />0.900 <br />Site altitude: <br />6,615 Ifeet <br />1.000 <br />Material weight (lbs /LCY): <br />2,650 1 Decomposed rock - 25% Rock, 75 */o Earth <br />0.868 <br />(2300 lb. default) <br />Blade type: <br />Semi- Universal <br />1.000 <br />Net correction: <br />0.351 <br />Adjusted production: <br />222.87 LCY /hr <br />Work team size: <br />3 Dozer(s) <br />Work team production: <br />668.62 LCY /hour <br />Job totals <br />Job time: <br />51.58 Hours <br />Job unit cost: <br />$0.868 per LCY <br />Job cost: <br />$29,925 <br />P- 2010 -026 bondcalc 01a Page 8 of 17 <br />