My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-12_REVISION - M1997058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997058
>
2011-07-12_REVISION - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:42:01 PM
Creation date
7/13/2011 11:38:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
REVISION
Doc Date
7/12/2011
Doc Name
Reduction of Financial Warranty
From
Planit, LLC
To
DRMS
Type & Sequence
SR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit l.- Baseline Resource SEO Slurry Wall Approval <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Stmt, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866 -3589 <br />httpJJWww.water.state.co.us <br />Scott Palmer, P.E. <br />Deere & Ault Consultants, Inc. <br />600 S. Airport Road, Building A, Suite 205 <br />Longmont, CO 80503 <br />Re: Walker Reservoir Phase l: Pond Nos. 1 and 2 <br />D&A Job No. CG -0134.014.00 <br />Water Division 1, Water District 2 <br />Dear Scott: <br />The purpose of this letter is to approve the lining of the above referenced gravel pit. This approval <br />is based on the information you provided under a covers letters dated June 13, 2007 and August <br />10, 2007 as well as the site inspection conducted on July 10, 2007. The estimated pit inflows <br />from precipitation and groundwater and outflows due to pumping and evaporation indicate that <br />this aft has been lined to the design standard referenced in the August 1999 State Engineer <br />Guidelines for Lining Criteria for Gravel Pits. Meeting the design standard requires that all <br />water inflows and outflows for this pond must be accounted for on a monthly basis. <br />Please call me if you have any questions. <br />CC: Robert Stahl, Water Commissioner <br />Shera Sumerford, Water Commissioner <br />STA'I'E OF COLORADO <br />September 11, 2007 <br />Sincerely, <br />Jana C. Ash, P.E. <br />Water Resource Engineer <br />Bill Ritter. Jr. <br />Gov <br />Harris D. Sherman <br />Exec tive Director <br />N <br />State Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.