Laserfiche WebLink
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />D = Day Shift N = Night Shift <br />ame <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: June 25, 2011 <br />Reporting Period: 6/19/11 through 6/25/11 <br />Project No.: 84201125E0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 42 °F to 59 °F ( + / -) High: 54 °F to 84 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES/Lonestar: None. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) EARTHWORKS <br />A) Subgrade Preparation <br />1) VLF <br />Subgrade was inspected and approved for soil liner fill placement by an AMEC field <br />representative in the area shown on Figure 1. <br />B) Slope Contouring <br />1) VLF <br />Slope contouring performed between stations H6 +00 ( + / -) and H11 +00 ( + / -), approximately 0 <br />to 400 feet right of centerline. Slope contouring was performed using two CAT D -6 LGP <br />dozers and a CAT 312 excavator with a rock hammer attachment to remove rocks protruding <br />from the subgrade surface. Excess material from slope contouring was loaded into three CAT <br />740 haul truck using a John Deere 200 excavator and was hauled to an overburden storage area <br />designated by CC &V. <br />C) Cut to Fill <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 06.25.2011 <br />