Laserfiche WebLink
BTU EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE I D NO. 1211 -CO-09 -01370 -01 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211 -CO -09 -01370 -02 (OLD NO.9 EXCAVATION) <br />DATE/TIME: 7,21/4d <br />INSPECTOR SIGNATURE: <br />INSPECTOR T I T L E : t ititalnnneyt h e I • S / 7 4 2 - c /<sf' <br />Under the supervision of MichaBl W. Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />✓ A. Stability of fill (quarterly inspection) <br />B. Critical construction periods: <br />1. Removal of all organic material/topsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: rite., in ini (S knot r /< tit cfvfeI I ( <br />Aid .4,v e kregg \ 514 e <br />ritAs eels , <br />CV" f wee S feGt4rr, ,,1 vvil9. <br />d l i �rp,.r &salev aY Pa r(, 2dti <br />file: I:\ EN\ ENVIRONMENTALEMPIRMINSPREP \WASTEPILEFORM.DOC <br />