Laserfiche WebLink
1. Person/Permittee <br />9. P ermit Number ,Ot 1 J �� <br />pN i nmt� ��1tj S 10. Permit T e <br />Type <br />C- 038 -81 <br />PP <br />I BOWIE RESOURCES LIMITED <br />11. <br />Field Visit Date 12. Pu .ose 13 <br />SRA Present <br />C <br />Facility Type <br />2. Address <br />05/26/2011 <br />OPI <br />PO BOX 1488 <br />mm -dd - yyyy <br />14. Permit Status 15. <br />Site Status 16. <br />3. City 4. State <br />IN <br />_ <br />BEF <br />PAONIA <br />CO <br />17 OSM Office # 18. <br />CCID # 19. Land Code <br />5. Zip Code 6. Phone Number <br />1140 <br />1 <br />I <br />ISF <br />81428 <br />(970) 527 - 4135 <br />20 M.S.H.A ID 4 21.State Code 22. County Name <br />7. Operator Name (if different than Permittee) <br />-01962 <br />CO <br />(DELTA <br />1 <br />I 105 <br />23. AVS Permittee Enity ID Number 24. State Office <br />8. Mine Name <br />1105415 <br />1 <br />BOWIE NO. 1 <br />25. Hours <br />26. Si tore Block <br />27. iewing f fici � <br />4.00 <br />a. Permit Review <br />ignature <br />Christy Hulsman ID # 532 <br />Signature ����jj�� � <br />* N 11kr ' ....i <br />8.00 <br />b. Site Visit Time <br />Review Date: <br />I 7. 7 -1/ <br />Printed Name <br />I 11.00 c. Travel Time <br />mm - dd - yyyy <br />Is Supplemental MSE Page Used Y ?N <br />Date: <br />07/07/2011 <br />( <br />I 4.00 <br />d. Report Writing <br />Permit Type - Item 10 IP = Interim Program PP = Permanent Program , NP = No Permit <br />Purpose Type Codes - Item 12 CCR Citizen Compliant Referral (non site <br />Oxx... Oversight RFx... Reclamation Fees CC" Citizen Complaint (initial site visit) <br />Axx... Assistance Fxx... Federal Actions CCF Citizen Complaiont Follow -up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(g) <br />permitted but not yet disturbed. AB1.. Bond Forfeiture: .Bond forfeiture officially in process or completed, and <br />IN... Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2.. Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to <br />Coal mining completed and reclamation activities initiated reclaim site, but site not reclaimed to Program standards. <br />BR.. Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA.... Not Applicable: When site is unpermitted. <br />Site Status Codes - Item 15 NS.. Non -Site Visit: Status of site not determined. <br />ND.. No Disturbance: No coal mining and reclamation MC.. Mining Complete: No mining activity on site, site FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC.. Temporary Cessation: The RA has granted performance bond(s), and /or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1... Phase I Release: At least Phase I bond release reclamation completed. <br />activities are occurring granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that is <br />AN.. Active Non - Producing: Active non - producing permits, partial bond release. permitted but there is no bond. <br />facility such as tipple or preparation plant. P2... Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />NM.. No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and the <br />not in Temporary Cessation, no surface coal P3... Phase III Release: Reclamation completed and activity is not covered by the required <br />mining activity, and site not regraded. the RA has released all bond. permits from the RA. • <br />Facility Type Codes - Item 16 D... Ancillary (Haulroad, Conveyor, and /or Rails) H... Exploration Permits L.. Remining site permitted <br />A... Surface E... Refuse and /or Impoundment I... Notice of Intent to Explore under 30CFR785.25 <br />B... Underground F... Loading Facility and /or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G... Stockpiles K.. Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business. If you are a small business (a business with 500 or fewer employees including those of affiliates) <br />888 734 3247). <br />and wish to comment on the enforcement or compliance activities of OSM, call 1- 888 -REG -FAIR (1- - - <br />I Page 1 of <br />Revised October I, 2010 <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINIeN 0 <br />Mine Site Evaluation <br />State Program 1011 ���,0 n, <br />