Laserfiche WebLink
Permittee/ <br />Person <br />MOUNTAIN COAL COMPANY LLC <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />Permit <br />Number <br />so-o07 <br />Field Visit <br />Date <br />)5/25/2011 <br />State Program <br />Continuation Page <br />28. Performance Standard Categories <br />Codes: 1-Compliance, 2= Noncompliance, 3 =Not Planned, 4 =Not Started, 5= Noncompliance Identified Elsewhere, 6= Previously Cited <br />A. Administrative <br />1. Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. _ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. Ownership and Control <br />6. 3 Temporary Cessation <br />7. _ AML Rec. Fees -- Non - Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. Inspections & Certifications <br />3. Siltation Structures <br />4. 1 Discharge Structures <br />5. 1 Diversions <br />6. Effluent Limits <br />7. Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage -- Acid -Toxic Materials <br />10. Impoundments <br />11. 1 Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. Removal <br />2. Substitute Materials <br />3. Storage and Protection <br />4. Redistribution <br />D. Backfilling & Grading <br />1._ Exposed Openings <br />2._ Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4. Highwall Elimination <br />5._ Steep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Materials <br />7._ Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />1._ Placement <br />2._ Drainage Control <br />3._ Surface Stabilization <br />4._ Inspections & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles /Impoundments) <br />1._ Drainage Control <br />2. 1 Surface Stabilization <br />3. 1 Placement <br />4._ Inspections and Certifications <br />5._ Impounding Structures <br />Use Of Explosives <br />1._ Blaster Certification <br />2._ Distance Prohibitions <br />3._ Blast Survey /Schedule <br />4._ Warnings & Records <br />5. Control of Adverse Effects <br />G. <br />H. _ Subsidence Control Plan <br />I. Roads <br />1. 1 Road Construction <br />2. Certification <br />3. Drainage <br />4. Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1. 1 Signs <br />2. Markers <br />K. _Distance Prohibitions <br />L. Revegetation <br />1. Vegetative Cover <br />2. Timing <br />M. _ Postmining Land Use <br />N. Other <br />General <br />Category <br />Performance <br />1) <br />2) <br />3) <br />Performance Standard Categories <br />30 CFR Counterparts <br />A Administrative ................................................ ............................... <br />"7311 <br />'73.1 l <br />3.17 <br />800.60 <br />5. Ownership andContml -------- ------------ - - - - -- - 75 -13 <br />6. Temporary Cessation S- 12.11(e)& 816/817.131 <br />7. AML Rec. Fees - Non- Reondent 8 -15(b) <br />S. <br />AML Rec. Fees - Failure to Pay 5 <br />B. Hydrologic Balance (816/817.41 - 5 7 7) <br />1. Valid Permit <br />2. Mining withiri Bonded Area <br />3. Terms & Conditions of Permit <br />4, Liability Insurance <br />2. echoers : Certifications 49(a XI) <br />3. Siltation Structures <br />Discharge Structures 1 <br />5. Diversions '13 <br />6. Effluent Limits 42 <br />41(c) <br />S. Surface Water Monitoring ------------ --------- -41(e) <br />9. Drainage-Acid - Toxic Materials 41(f) <br />10. Impoundments 49 <br />11. Stream Buffer Zones <br />C. Topsoil & Subsoil (816817.22) <br />I. Removal ---------- ----- ------------- -- 22 2(a) <br />2. Substitute Material s.------------ ------- --- ------ -22(c) <br />3. Storage and Protection 22(c) <br />4. Redistribution 22(d) <br />P.Backfilling & Grading 316/817.95 - 107) <br />1. Exposed Openings ---------------------516/S17.13, 14,15, & S 3.11 & <br />2. ConternporarreousReclamaation 100 <br />3. Approximate Original Contour 102(a)(1) <br />4. Highwall Elimination 1112 (a)(2 ) <br />5. Steep Slopes (includes downslope) 107 <br />6. Handling of Acid & Toxic Materials 102(c) <br />7. Stabilization (rills and gullies)----------------- ---------- -95(b) <br />7. Ground Water Monitoring <br />7 <br />E. Excess Spoil Disposal (316/817.71 - 74) <br />1. Placement. 7 1(e) <br />2 .. Drainage Control 71(f) <br />3. Surface Stabilization. 71(g) <br />4. Inspections & Certifications 71(h) <br />F. Coal Mine Waste {Refuse Prier/Impoundments) - 8161817.51 -84) <br />1. Drainage Control .83(a) <br />2 Surface Stabilization 53(b) <br />3. Placement 53(c) <br />4. Inspections and Certifications 53(d) <br />5. Impoumdutg Structures------------------- - - - - -- 84 <br />G. Use of Explosives <br />(816/817.61 -68) <br />1. Blaaer Certification 61(c) <br />2. Distance Prohibitions -61(d) <br />3. Blau Survey Sdiedu le 62 4 <br />4. Wanungs & Records 66 & 68 <br />5. Control of Adverse Effects 67 <br />H. Subsidence Control Plan (817.121 -122) <br />L Roads (816317.150 -151) <br />1. Road Construction 150(c) <br />2. Certification 151(a) <br />3. Drainage 150(b)-151(d) <br />4. Surfacing and Maintoance 15C(e)- 151(d) <br />5. Reclamation- --- ------- --- - - - - -- ------ 150(f) <br />J. Signs & Markers 816/817.11) <br />1. Signs 11(a),(b),&(c) <br />2. Mark rs 11ta),(b),(d):(e): 1 ) <br />K. Distance Prohibitions (761.11) <br />L. Revegetation (816/817111-116) <br />1. Vegetative Cover 111 &.116 <br />M. Postmining Land Use (816 <br />Page 2 of <br />Revised October 1, 2010 <br />