Laserfiche WebLink
Binns, Janet <br />From: TARAZOFF, JAMES A [JimTarazoff @chevron.com] <br />Sent: Tuesday, July 12, 2011 2:38 PM <br />To: Binns, Janet ff <br />Subject: RE: EDNA Project Update <br />Janet, <br />I spoke with Chris Keough today. He is in the field at the Edna Project. He reports good results and is going to send an <br />email and some pictures. You should see the results during your next inspection. He said he probably could send the <br />written report in about 2 weeks as he is in the field until then. <br />I am contracting to blade the road but, in addition, we are going to lay down more gravel and do some improvement in the <br />drainage ditch as well. A little overkill, but we want to do the job right! <br />Jim <br />Jim Tarazoff, Land Manager <br />Chevron Mining Inc. <br />116 Inverness Drive East, Ste 207 <br />Englewood, CO 80112 <br />(303) 930 -4084 <br />From: Binns, Janet [ mailto:Janet.Binns @state.co.usl <br />Sent: Monday, July 11, 2011 3:23 PM <br />To: TARAZOFF, JAMES A <br />Subject: RE: EDNA Project Update <br />Thank You Jim, <br />Please send the weed management summary as soon as possible. I forwarded the written letter of objection from John <br />Redd to you. Please also keep me posted on the grading of the road. I concur that reconstruction of the damaged <br />section on road is unnecessary. Grading of the damaged portion should be adequate . <br />Jcui,et a--t. gi,vwk,s <br />Environmental Protection Specialist II <br />Colorado Division of Reclamation Mining and Safety <br />phone: (303) 866 -3567 ext. 8107 <br />fax: (303) 832 -8106 <br />From: TARAZOFF, JAMES A f mailto:JimTarazoff(achevron.coml <br />Sent: Thursday, July 07, 2011 12:49 PM <br />To: Binns, Janet <br />Subject: EDNA Project Update <br />Janet, <br />1 <br />Sorry that I missed your call. Just as an update, Chris Keough should be out with his crew this week, making the second <br />round of spraying for weeds, concentrating on areas that you identified in the recent permit release inspection. I also <br />contacted him to ask that the summary of 2011 weed control be sent to you as soon as he is finished. <br />I just spoke with Troy Summers with WWC Engineering regarding the road repair. He had obtained a quote from a <br />company that was way too extensive. It was for basically rebuilding the road and adjacent ditch. I asked him to obtain a <br />