My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-12_REVISION - C1980001
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980001
>
2011-07-12_REVISION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:36 PM
Creation date
7/13/2011 9:38:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REVISION
Doc Date
7/12/2011
Doc Name
Project Update
From
Chevron Mining, Inc
To
DRMS
Type & Sequence
SL11
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Binns, Janet <br />From: TARAZOFF, JAMES A [JimTarazoff @chevron.com] <br />Sent: Tuesday, July 12, 2011 2:38 PM <br />To: Binns, Janet ff <br />Subject: RE: EDNA Project Update <br />Janet, <br />I spoke with Chris Keough today. He is in the field at the Edna Project. He reports good results and is going to send an <br />email and some pictures. You should see the results during your next inspection. He said he probably could send the <br />written report in about 2 weeks as he is in the field until then. <br />I am contracting to blade the road but, in addition, we are going to lay down more gravel and do some improvement in the <br />drainage ditch as well. A little overkill, but we want to do the job right! <br />Jim <br />Jim Tarazoff, Land Manager <br />Chevron Mining Inc. <br />116 Inverness Drive East, Ste 207 <br />Englewood, CO 80112 <br />(303) 930 -4084 <br />From: Binns, Janet [ mailto:Janet.Binns @state.co.usl <br />Sent: Monday, July 11, 2011 3:23 PM <br />To: TARAZOFF, JAMES A <br />Subject: RE: EDNA Project Update <br />Thank You Jim, <br />Please send the weed management summary as soon as possible. I forwarded the written letter of objection from John <br />Redd to you. Please also keep me posted on the grading of the road. I concur that reconstruction of the damaged <br />section on road is unnecessary. Grading of the damaged portion should be adequate . <br />Jcui,et a--t. gi,vwk,s <br />Environmental Protection Specialist II <br />Colorado Division of Reclamation Mining and Safety <br />phone: (303) 866 -3567 ext. 8107 <br />fax: (303) 832 -8106 <br />From: TARAZOFF, JAMES A f mailto:JimTarazoff(achevron.coml <br />Sent: Thursday, July 07, 2011 12:49 PM <br />To: Binns, Janet <br />Subject: EDNA Project Update <br />Janet, <br />1 <br />Sorry that I missed your call. Just as an update, Chris Keough should be out with his crew this week, making the second <br />round of spraying for weeds, concentrating on areas that you identified in the recent permit release inspection. I also <br />contacted him to ask that the summary of 2011 weed control be sent to you as soon as he is finished. <br />I just spoke with Troy Summers with WWC Engineering regarding the road repair. He had obtained a quote from a <br />company that was way too extensive. It was for basically rebuilding the road and adjacent ditch. I asked him to obtain a <br />
The URL can be used to link to this page
Your browser does not support the video tag.