Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 314 Page 2 of 2 <br />Job Condition Correction Factor <br />Operator Skill: 0.750 <br />Material consistency: 1.000 <br />Dozing method: 1.000 <br />Visibility: 1.000 <br />Job efficiency: 0.830 <br />Spoil pile: 0.800 <br />Push gradient: 0.903 <br />Altitude: 0.950 <br />Material Weight: 0.902 <br />Blade type: 1.000 <br />Net correction: 0.3853 <br />Adjusted unit production: 479.00 LCY /hr <br />Adjusted fleet production: 479 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />1 Dozer(s) <br />$0.415 /LCY <br />22.78 Hours <br />$4,523.74 <br />Source <br />(AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND -RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />