Laserfiche WebLink
The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided there <br />are no objections, the decision will become effective upon the termination of the ten (10) day public <br />comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br />Technical Revision No. 85 Decision: Withdraw <br />Submittal Date: February 10, 2010 Decision Date: June 29, 2011 <br />Description of Revision: Updates the Reclamation Bonds Currently Held By <br />Colowyo and Consolidates them Into One single Bond <br />REVISED INFORMATION <br />APPLICATION PAGES MAPS/EXHIBITS <br />CHANGE IN <br />ACREAGE <br />Disturbed: <br />Affected: <br />Permit: <br />State: <br />Federal: <br />Private: <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Authorized Representative <br />Date: <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />REVISED <br />TOTAL ACREAGE <br />0.00 Disturbed: 4,766.30 <br />0.00 Affected: 4,764.80 <br />0.00 Permit: 12,250.95 <br />0.00 State: 640.00 <br />0.00 Federal: 2,290.19 <br />0.00 Private: 9,320.76 <br />COAL MINING PERMIT - TECHNICAL REVISION DECISION <br />Colowyo Coal Mine, Colowyo Coal Company L.P. <br />Permit No. C- 1981 -019 <br />PERFORMANCE BOND <br />Prior Liability: <br />Change in Liability: <br />Revised Liability <br />Bond Held <br />$68,302,092.83 <br />$0.00 <br />$68,302,092.83 <br />$83,156,939.00 <br />C- TR- 09_ C1981019_JHB_07112011084236.doc <br />