Laserfiche WebLink
Binns, Janet <br />From: TARAZOFF, JAMES A [JimTarazoff @chevron.com] <br />Sent: Thursday, July 07, 2011 12:49 PM <br />To: Binns, Janet L <br />Subject: EDNA Project Update 5 <br />Janet, <br />Sorry that I missed your call. Just as an update, Chris Keough should be out with his crew this week, making the second <br />round of spraying for weeds, concentrating on areas that you identified in the recent permit release inspection. I also <br />contacted him to ask that the summary of 2011 weed control be sent to you as soon as he is finished. <br />I just spoke with Troy Summers with WWC Engineering regarding the road repair. He had obtained a quote from a <br />company that was way too extensive. It was for basically rebuilding the road and adjacent ditch. I asked him to obtain a <br />quote for grading the road. We should receive that by the end of next week. We will repair the water damage to the road, <br />hopefully before your next monthly inspection. <br />Hope you had a great Independence Day Weekend! <br />Jim <br />Jim Tarazoff, Land Manager <br />Chevron Mining Inc. <br />116 Inverness Drive East, Ste 207 <br />Englewood, CO 80112 <br />(303) 930 -4084 <br />1 <br />