Laserfiche WebLink
11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Thirty (30) air /air mist rotary holes are proposed. Access will be by old roads /tracks and <br />overland travel. No road construction will occur. No surface disturbance for the drill pads or <br />access trails is anticipated. A small mudpit (10' x 10' x 3') will be excavated for the placement <br />of either d ry ur we uuttirrys. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 30.00 Average Width 30.00 (ft) Average Length 65.00 (ft) <br />B. Drill Holes: Quantity 30.00 Depth 300.00 (ft) Diameter 5 (in) <br />C. Mud Pits: Quantity 30.00 Average Width 10.00 (ft) Average Length 10.00 (ft) <br />Average Depth (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />None <br />F. Other Disturbances (please describe): <br />None <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />11•. • - - <br />. tf• GI . 1 <br />u 1 1 1 . 1• • 1 1 . • -• • <br />4 (FORM 2 - Public filing) <br />and support vehicles. Fuel, oils and fluids will be stored in the beds of the support vehicles <br />and removed from the drilling area at the end of each day. <br />F. New Road(s): Length 0.00 (ft) Width 0.00 (ft) <br />Significantly Upgraded Road(s) Length 0 00 (ft) Width 0.00 (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />None proposed <br />