Laserfiche WebLink
• TABLE 21-2 <br /> Projected Topsoil Salvage by Soil Map Unit for Mining <br /> Areas 1 and 4 during 1988-1989, Nucla Mine, <br /> Montrose County, Colorado, July 1988 <br /> Total <br /> Topsoil Topsoil <br /> Map Unit Area Salvage Depth Volume <br /> Designation (Acres) (Feet) (Ac.Ft.) <br /> Disturbed2 56.38 - 82.123 <br /> Roads/Ponds 0.92 0.00 0.00 <br /> 5810/7C-2 10.15 1.67 16.95 <br /> 58101/3B-2 0.10 2.00 0.20 <br /> 58101/7C-1 1.30 1.67 2.17 <br /> 5810E/D-2 0.83 0.67 0.56 <br /> • 9904/D-2 1.65 0.50 0.82 <br /> Reclamation 1.42 1.00 1.42 <br /> 5810/2B-1 0.68 2.00 1.36 <br /> TOTAL 73.434 - 105.60 <br /> (104.16)3 <br /> 1 <br /> Map Unit Designation follows the 1979 Soil Survey in Tab 9 (Soil Survey). <br /> 2 <br /> Area currently disturbed (Permit C-008-81) which will require replaced topsoil. <br /> This total does not include sediment ponds (10.5 acres), existing and proposed <br /> topsoil stockpiles (17.6 acres), explosive storage area (1.1 acres), associated <br /> access roads (2.3 acres), pre-law spoil piles (14.4 acres), pre-law shop area <br /> (0.1 acres), and pre-law facilities (2.2 acres) which, when combined, total 48.2 <br /> acres. <br /> 3 <br /> Topsoil which currently exists in stockpiles. See Exhibit 21-1, Topsoil Balance <br /> Plan or Exhibit 12-2, Operations Plan, for locations and Table 21-1 for individual <br /> stockpile volumes. TS 1 has 1.44 acre-feet which is dedicated to reclamation of <br /> temporary bypass road and thus is not figured in the total available for other reclamation. <br /> 21-13 Revised 08/19/88 <br />