Laserfiche WebLink
E' <br />8200 <br />-_. _. <br />8200 <br />-- <br />8100 <br />8000 <br />8000 <br />7000 <br />.... <br />. <br />7800 <br />7800 <br />7800 <br />7700 <br />7700 <br />7800 <br />7500 <br />7500 <br />7500 <br />REGRADED <br />RECLAIMED <br />7400 <br />74W <br />73W <br />- <br />7300 <br />STREETER FILL <br />7200 <br />7200 <br />7100 <br />- -- <br />7100 <br />7000 <br />11000 12000 13000 14000 15000 <br />7000 <br />15000 17000 18000 <br />.— <br />0 1000 20M 3000 4000 5000 BOW 7000 8000 8000 10000 <br />0 +00.00 <br />CROSS SECTION E - E' <br />Horizontal Scale: 1 "= 500' <br />Vertical Scale: 1 "= 200' <br />c <br />"WA S <br />PREMINING & POSTMINING <br />CROSS SECTIONS <br />E -E' <br />LEGENDSCALE: <br />SEE SECTION TEXT <br />ENGINEERS CERTIFICATION <br />DATE: 119106 <br />1, THOMAS o PETERSON, beings <br />Licensed Professional Engineer m <br />DRWG. BY: TCP /ESI <br />PREMINING TOPOGRAPHY <br />the State of Colorado, do hereby <br />certify that Phis map has been <br />F..3 <br />Colowyo Coal Company <br />APPROVED BY., <br />NOTE: FOR CROSS SECTION L OCATIONS SEE <br />reviewed by me and is true and <br />Meeker, State Highway 13 <br />Meeker, Colorado 61641 <br />POSTMINING TOPOGRAPHY <br />"PREMINING <br />correct to the best of fo matio lo7owledge <br />andrelln on other informationsu I/ed <br />3 <br />DRWG NO. MAP 0A <br />TOPOGRAPHY" MAP 18, & <br />byeZertsidentified in section 2.03 of the <br />L <br />- - - POSTMINING TOPOGRAPHY PRIOR TO TR81 <br />"POSTMINING TOPOGRAPHY" MAP 19 <br />Co /owyo Coe / Company L.P. Permit. <br />O <br />- REGRADED AND RECLAIMED, DECEMBER 2009 <br />Q0 L <br />to the POSTMINING TOPOGRAPHY <br />�J` o�P .•••••. �Fy 4� <br />, P •• <br />No. <br />REVISION <br />DATE <br />BY <br />CHK <br />. s <br />4 O: 4 f fFy : C� i <br />TR <br />• 32257 <br />POSTMINING TOPOGRAPHY CHANGE ( PMT 8R4) <br />10108102 <br />RWF <br />SRH <br />� •. fZ�G �(° � � � <br />56 <br />TR <br />63 <br />New orwes <br />N PMT Nt lan06 Optimized Contours <br />p <br />1191066 <br />TCP <br />TAT <br />500' 0 500' 1000' o�F•••• ••••• •••• \``�� <br />G ' <br />'lei��i <br />/ONA� - �� <br />� ,n <br />(HORIZONTAL SCALE ONLY) THOMAS C PETERSON <br />TR <br />POSTMINING TOPOGRAPHY CHANGE (PMT ESI Topo 8 09) <br />8/07/09 <br />TCP <br />TAT <br />P.E. No. 32257 <br />81 <br />only for Cross Sections B, C and E <br />TR <br />POSTMINING TOPOGRAPHY CHANGE (PMT TR81 0510) and added POSTMINING <br />81 <br />TOPOGRAPHY PRIOR ToTR81. Both topographies e ffectedonly cross section E. <br />5128110 <br />TCP <br />KRB <br />DATE <br />Updated Regraded and Reclaimed areas to December 2009. <br />TR <br />Postmining Topography Change (PMT TR81 i 110) <br />81 <br />Cross Section E -E did not change. <br />12106110 <br />TCP <br />KRB <br />