Laserfiche WebLink
July 6, 2011 1 <br />Horse Gulch Fill Quarterly Inspection Report <br />Second Quarter of 2011 <br />Table of Contents <br />1.0 Introduction 2 <br />2.0 Critical Construction Periods 2 <br />2.1 Removal of All Organic Material and Topsoil 2 <br />2.2 Placement of Underdrainage Systems 2 <br />2.3 Installation of Surface Drainage Systems 2 <br />2.4 Placement and Compaction of Fill Materials 2 <br />2.5 Revegetation 3 <br />3.0 References 4 <br />I certify that this report was prepared by me. <br />Tonia Marie Perkins <br />CO PE 43864 <br />Mining Engineer <br />Trapper Mining, Inc. <br />PROFESSIONAL SEAL <br />