Laserfiche WebLink
Task description: Replacing Topsoil <br />Western Sugar Reclamation Permit Action: <br />Site: Land Development Project <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />003 <br />6/20/2011 <br />MAC <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $227.48 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />County: Weld <br />- Scraper: <br />- Dozer: <br />9,849 <br />9,849 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />1,600 lbs/LCY <br />Top Soil <br />48,000 pounds <br />30.00 LCY <br />SCRAPER TEAM WORK <br />State: Colorado <br />Equipment Description <br />Cat 627G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Cat Handbook <br />Financial Warranty <br />Calculation Permit/Job #: M2010049 <br />COSTShift basis: 1 per day <br />upport Equipment <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M049 -003 <br />Maintenance Equipment <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 15.70 LCY <br />Heaped Volume: 22.00 LCY <br />Average Volume: 18.85 LCY <br />Adjusted Capacity: 18.85 LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$48.66 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$140.14 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$38.67 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$227.48 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$227.48 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Task description: Replacing Topsoil <br />Western Sugar Reclamation Permit Action: <br />Site: Land Development Project <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />003 <br />6/20/2011 <br />MAC <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $227.48 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />County: Weld <br />- Scraper: <br />- Dozer: <br />9,849 <br />9,849 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />1,600 lbs/LCY <br />Top Soil <br />48,000 pounds <br />30.00 LCY <br />SCRAPER TEAM WORK <br />State: Colorado <br />Equipment Description <br />Cat 627G <br />NA <br />NA <br />NA <br />NA <br />NA <br />CCY <br />LCY <br />Cat Handbook <br />Financial Warranty <br />Calculation Permit/Job #: M2010049 <br />COSTShift basis: 1 per day <br />upport Equipment <br />Swell factor: 1.000 <br />Division of Reclamation, Mining & Safety <br />Abbreviation: None <br />Page 1 of 2 <br />Filename: M049 -003 <br />Maintenance Equipment <br />Scraper Bowl (volume) Basis: <br />Struck Volume: 15.70 LCY <br />Heaped Volume: 22.00 LCY <br />Average Volume: 18.85 LCY <br />Adjusted Capacity: 18.85 LCY <br />CIRCES Cost Estimating Software <br />