Laserfiche WebLink
Task description: Road Grading <br />Cost. Breakdown: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14H <br />Ripper Attachment: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Unit cost: $12.63 per acre <br />MOTOR GRADER WORK <br />Western Sugar Reclamation Permit Action: Financial Warranty <br />Site: Land Development Project Calculation Permit/Job #: M2010049 <br />PROJECT IDENTIFICATION <br />Task #: 008 State: Colorado Abbreviation: None <br />Date: 6/27/2011 County: Weld Filename: M049 -008 <br />User: MAC <br />$34.52 <br />$13.93 <br />$0.00 <br />$38.49 <br />$86.95 <br />Total Fleet Cost/Hour: $128.74 <br />Utilization % <br />NA <br />25 <br />NA <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 4.60 acres <br />Source of estimated acreage: Exhibit D - Mining Plan <br />HOURLY PRODUCTION <br />Average Grader Speed: 6.25 mph <br />Selected Application: Road maintenance (3 -9.5 mph) - 6.25 <br />Selected Blade Angle: 30 degrees <br />Effective Blade - Length: 12.10 feet <br />Width of blade overlap per pass: 2.00 feet <br />Net grading or ripping width per pass: 10.10 feet <br />Unadjusted Hourly Unit Production: 7.6515 acres/hour <br />Job Condition Correction Factors Site Altitude: 4600 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (lsh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: 6.8864 acres/Hour <br />Adjusted Hourly Fleet Production: 6.8864 acres/Hour <br />Horsepower: 215 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) Total job time: 2.67 Hours <br />Total job cost: $232.00 <br />CIRCES Cost Estimating Software <br />