Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />. Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />Dewatering Tract A <br />PUMPING <br />.--i N <br />2,495.69 <br />$17,515.00 <br />$38,791.28 <br />$4,821.10 <br />$13,977.39 <br />$5,230.46 <br />$20,528.22 <br />$1,883.00 <br />$232.00 <br />Backfilling highwall <br />DOZER <br />94.35 <br />Replacing Topsoil <br />SCRAPER1 <br />21.19 <br />Revegetation of Disturbed Areas <br />REVEGE <br />0.00 <br />Equipment Mobilization/Demobilization <br />MOBILIZE <br />3.57 <br />Replacement Pump <br />NA <br />0.00 <br />Road. Maintenance <br />MISCTRUK <br />29.00 <br />Road Grading <br />GRADER <br />2.67 <br />SUBTOTALS: <br />2646.47 <br />$ $102,978.45 <br />Task description: Cost Summary <br />Western Sugar Reclamation Permit Action: Financial Warranty <br />Site: Land Development Project <br />PROJECT IDENTIFICATION <br />Task #: 006 State: Colorado <br />Date: 6/21/2011 County: Weld <br />User: MAC <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $2,080.16 <br />Performance bond: 1.05 Total = $1,081.27 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $10,297.85 <br />TOTAL 0 & P = $13,459.28 <br />CONTRACT AMOUNT (direct + O & P) = $116,437.73 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />COST SUMMARY ARK <br />Calculation Permit/Job #: M2010049 <br />0.00 <br />4.25 <br />5.00 <br />Abbreviation: None <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $24,229.77 <br />TOTAL BOND AMOUNT (direct + indirect) _ $127,208.22 <br />Filename: M049 -006 <br />Total = <br />Total = <br />0.00 <br />$4,948.60 <br />$5,821.89 <br />