Laserfiche WebLink
8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />No topsoil will be disturbed. <br />6 (FORM 2 - Public filing) <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Each drill hole will be back filled with bentonite pellets. Sediments will be <br />mixed with concrete at the top to form a ten foot plug which will prevent <br />surface water infiltration. Each hole will be plugged completely before the next <br />hole is drilled so that only one hole will be open at a time. The drill rig will <br />remain at drill hole locations through completion of DRMS abandonment <br />procedures. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />There will be no new disturbance. All activity will be on existing drill pads and access <br />roads. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />All access routes are by existing roads which will not require reclamation. Access roads <br />which the Forest Service has designated tor decommissioning will be completed according <br />berms or placement of obstacles at the intersection of decommissioned roads with road <br />888.3A. Figure -4 <br />