My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-05_PERMIT FILE - P2011018
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011018
>
2011-07-05_PERMIT FILE - P2011018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:20 PM
Creation date
7/7/2011 9:58:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011018
IBM Index Class Name
PERMIT FILE
Doc Date
7/5/2011
Doc Name
New NOI Application (form 2 public file)
From
Tomichi Resources, LLC
To
DRMS
Email Name
GRM
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Other Disturbances (please describe): <br />None. <br />4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />No new disturbance. All exploration activities to be conducted on existing drill pads and <br />access roads. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 0.00 Average Width (ft) Average Length (ft) <br />B. Drill Holes: Quantity 10.00 Depth 2,800.00 (ft) Diameter 4.00 (in) <br />C. Mud Pits: Quantity 0.00 Average Width (ft) Average Length (ft) <br />Average Depth (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />No underground work will be performed. <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Diesel fuel will be used. No on -site storage. The drill rig will be refueled from a mobile tank <br />and the support vehicles and the mobile tank will be refueled off site. <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />No new roads will be constructed or upgraded. All access routes will be on existing <br />roads. <br />
The URL can be used to link to this page
Your browser does not support the video tag.