My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-05_REPORT - M1997064
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1997064
>
2011-07-05_REPORT - M1997064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2018 3:52:38 PM
Creation date
7/6/2011 8:49:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997064
IBM Index Class Name
REPORT
Doc Date
7/5/2011
From
GCC Rio Grande, Inc.
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,9 <br />Annual Report <br />Permit tee Name: fr GCC Rio Grande, Inc. <br />Permit Number: K- 1997 -064 <br />Operation Name: Salt Canyon Project <br />Anniversary Date: July 9, 2010 <br />There will be no mining in 2011 besides core hole drilling. <br />R ECEIVED <br />UI 05za ir � <br />t Division of Reclam <br />Mining & Safe� <br />Mining at the Salt Canyon Project was active on March 1, 2011. With the mine in the <br />beginning stages the area was cleared in preparation for an initial blast. On March 7, <br />2011 the first blast took place. This blast was to develop the face of the high wall. We <br />began mining gypsum in March all the way till June 15, 2011. We mined 17,654st during <br />this time frame, and as of June 28, 2011 only 248st has been delivered to the plant site. . <br />We are currently working with DOT to get a permit to remove the gypsum, and we are <br />expecting the gypsum to be removed from Salt Canyon by Dec 31, 2011. <br />We have currently ceased mining operations at the Salt Canyon Project. We are <br />looking at doing more core hole drilling in an effort to find a good gypsum deposit. We <br />will need to determine the quality of gypsum going further to insure we are mining in the <br />correct location. <br />The initial area mined is still in portions of the initial phase one and two of the original <br />permit. The area on the map in blue is the blasted and mined area and will not go any <br />further this year. This will not exceed our ten acre original limit for this year. The work in <br />this area is buffered from view of the patrons along Hwy. 115 by the initial phase four <br />area that runs parallel to the highway. <br />
The URL can be used to link to this page
Your browser does not support the video tag.