My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-29_PERMIT FILE - P2011014 (4)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011014
>
2011-06-29_PERMIT FILE - P2011014 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:00 PM
Creation date
7/1/2011 3:11:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011014
IBM Index Class Name
PERMIT FILE
Doc Date
6/29/2011
Doc Name
NOI, Prospecting, Form 2
From
Climax Molybdenum
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Due to the steep slopes of the proposed disturbed areas, little top soil is expected. Any <br />appreciable topsoil encountered will be stockpiled at the drill pads and redistributed upon <br />completion. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />All drill holes will be plugged according to Rule 5.4. It is thought that the drill holes will <br />penetrate unsaturated unconsolidated materials and will continue deeper that ten feet into <br />bedrock and will not encounter an aquifer. These holes shall be securely plugged with <br />Leffler] dl the burfdGe. If any aquifers are encountered, lire rules as slated in 5.4 will be <br />followcd. <br />N/A <br />6 (FORM 2 - Public filing) <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />• _ • <br />• - - • • • - • IS , • • - - • - -' - • = • ! e .. <br />natural drainage patterns. Following rough grading, available topsoil will be applied and <br />seed will be spread. The seed mixture used will be appropriate to the elevation of the <br />road. Vehicular access to reclaimed roads will be restricted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.