My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-30_INSPECTION - M2005050
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2005050
>
2011-06-30_INSPECTION - M2005050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:03 PM
Creation date
7/1/2011 2:00:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005050
IBM Index Class Name
INSPECTION
Doc Date
6/30/2011
Doc Name
Inspection report
From
DRMS
To
Rimrock Exploration & Development, Inc.
Inspection Date
6/28/2011
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EPP on- Site Review <br />OBSERVATIONS <br />PERMIT #: M- 2005 -050 <br />INSPECTOR'S INITIALS: GRM <br />INSPECTION DATE: June 28, 2011 <br />This inspection was conducted as part of the normal monitoring program of the Colorado Division of <br />Reclamation, Mining, and Safety (Division) for permitted sites. The J -Bird Mine is 110d uranium mine located <br />on Wray Mesa in Western Montrose County. The Division Inspector, Russ Means, was accompanied by BLM <br />representative Rob Ernst. The operator, rim Rock Exploration representative on site was Wesley Chiles. The J- <br />Bird Mine has an approved environmental protection plan (epp) on file <br />The mine identification sign and affected area boundary markers are in place and in compliance with Rule <br />3.1.12. The sign is located on the gate at the entrance to the site as it enters the lower bench permit access <br />point. Permit boundaries are marked by t -posts that clearly marked the affected areas. <br />The inspector looked at the on -site storm -water control measures. These controls are part of the internal <br />mine plans approved by the Division and do not necessarily reflect other measures required by the Colorado <br />Department of Public Health and Environment's (CDPHE) issued stormwater permit. Those requirements are <br />regulated by CDPHE. <br />The required stormwater run -on diversion ditches are in place as required. Ditches are clean and maintained. <br />Some native vegetation is beginning to establish which will augment water energy dissipation and slope <br />stabilization. No erosion or sedimentation issues were observed. <br />Internal stormwater controls include grading and collection ditches that currently channel water to two <br />catchment ponds. <br />On the upper bench, the operator is doing maintenance work on the catchment pond that collects water from <br />the new portal and staging area. While not complete at the time of this inspection, it is noted it maintains its <br />original designed capacity. The lower catchment pond is the primary collection pond for the site. The banks <br />are becoming vegetated with volunteer vegetation that is being augmented by some seeding from the <br />operator. The inspector and the operator discussed the need to line the intake with stone to prevent erosion. <br />The inspector observed some minor cutting which needs to be addressed. The operator will submit the <br />designs for review in a pending Technical Revision. <br />The ore storage pad is empty of any ore. The operator removed the small stockpile noted in the last <br />inspection. While the intent is to still use the area as designed, they removed approximately 6 inches of <br />additional material to bring the area back to the established radiometric baseline. Drainage in the area <br />confines precipitation to the pad with a zero run -off during all but historic events. In that case, collector <br />ditches along the access road take the flow to the main catchment pond. <br />Groundwater monitoring has just concluded the five quarters of monitoring as required. The operator notes <br />that the one up gradient and two down gradient wells have remained dry as predicted. The operator may <br />now request a Technical Revision to adjust the monitoring interval too annually. The Division is requesting a <br />formal report noting the dates and results of the five quarters be submitted within 60 days. <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.