My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-01_REVISION - M2003058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003058
>
2011-07-01_REVISION - M2003058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:14 PM
Creation date
7/1/2011 9:59:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003058
IBM Index Class Name
REVISION
Doc Date
7/1/2011
Doc Name
Revised Conversion Application
From
Glenn E. Sessions & Sons, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />Mining Plan <br />a) This is an open pit mine where any area to be mined will have 2 " -6" of top soil <br />stripped and stockpiled for use in the reclamation process. <br />b) Earthmoving will be accomplished using loaders, dozers and excavators. They <br />will be brought into the pit using the existing access roads and will not affect the <br />adjacent lands. <br />c) There will be no water diversions or improvements that need or will be required <br />to mine the Fairbanks Pit. <br />d) Pit excavation will be limited to a 19 acre area. The limits of mining and the <br />permit boundary are marked with barbed wire fence. Mining will be done from <br />West to East. <br />e) Mining will be done for an indefinite time until all usable material has been <br />captured. After this phase, the reclamation process will begin. <br />(i) Mining Phase — Indefinite period of time, depending on the market <br />for gravel products. Reclamation Phase — At least one year to <br />ensure proper re- growth. <br />(ii) The area to be worked in will be within the 19 permitted acres for <br />mining purposes. For reclamation, the areas will be reclaimed in <br />the following order — "Stage 2 Fairbanks Pit ", "Pre -Law" Area and <br />"The original Fairbanks Pit" <br />(iii) The First step is Mining The second step is reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.