Laserfiche WebLink
SCRAPER TEAM WORK <br />Description <br />p <br />Acres <br />p soil <br />To Thickness <br />Loose Volume <br />I I <br />Unit Cost <br />Total Cost <br />I <br />Reference <br />I (ac) <br />I (ft) <br />(LCY) <br />($ /LCY) <br />($) <br />Replace topsoil on Final Pit <br />19 <br />1 <br />30,653 <br />$ 0.63 <br />$ 19,311.60 <br />CIRCES (dmg) <br />Arroyo Restoration <br />883710 <br />$ 0.63 <br />$ 556,737.30 <br />CIRCES (dmg) <br />Arroyo Topsoil <br />27 <br />1 <br />43,560 <br />$ 0.63 <br />$ 27,442.80 <br />CIRCES (dmg) <br />Table L -2 GCC Rio Grande Pueblo Limestone Quarry Reclamation Costs <br />SCRAPER TEAM WORK <br />