My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-30_REVISION - M2002004 (82)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002004
>
2011-06-30_REVISION - M2002004 (82)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:19 PM
Creation date
6/30/2011 1:27:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Revision
Doc Date
6/30/2011
Doc Name
Submittal
From
GCC Rio Grande
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCC RIO GRANDE, INC. <br />PUEBLO CEMENT PLANT AND LIMESTONE QUARRY <br />EXHIBIT L - RECLAMATION COSTS <br />Table L -1 summarizes estimated costs of reclamation of the GCC Rio Grande Pueblo Limestone Quarry. <br />This estimate is based on a very conservative scenario for bonding. <br />Costs are estimated based on R. S. Means Heavy Construction Cost Data, 15` Edition 2001 and unit costs <br />used for comparable reclamation activities described in other recently approved reclamation permits in <br />Colorado, most notably for the Climax Mine (Permit No. M -77 -493). In addition, costs from the <br />Division's CIRCES cost estimates program were used where appropriate. <br />Consistent with GCC Rio Grande's Air Quality Permit, the surface mine will be reclaimed concurrently <br />with mining, so that no more than approximately 30 acres (less than 15.5 acres subject to wind erosion) <br />should be unreclaimed at any given time. Grading includes smoothing final highwalls to no steeper than <br />4H:1 V and establishing drainage. <br />After direct costs are estimated, they are totaled and indirect overhead costs are added as follows: <br />Insurance, Bonding, Contractor's Profit 12.6% <br />Engineering and Administration 9.25% <br />Revised June 29, 2011 <br />L -1 <br />Exhibit L — Reclamation Costs <br />
The URL can be used to link to this page
Your browser does not support the video tag.