My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-30_REVISION - M2002004 (82)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002004
>
2011-06-30_REVISION - M2002004 (82)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:19 PM
Creation date
6/30/2011 1:27:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
Revision
Doc Date
6/30/2011
Doc Name
Submittal
From
GCC Rio Grande
To
DRMS
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCC <br />Rio Grande <br />No other amendments to the Permit are proposed. <br />sa <br />Loretta A. Pineda, Director <br />Colorado Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St. Room 215 <br />Denver, Colorado 80203 <br />RE: Regular 112 Operation Mining Permit No. M- 2002 -004 <br />GCC Rio Grande, Inc. — Pueblo Cement Plant and Limestone Quarry, Pueblo, Colorado <br />Application for Permit Amendment <br />Dear Ms. Pineda: <br />GCC Rio Grande, Inc. (GCC) hereby submits the enclosed application to amend the referenced Regular <br />112 Operation Permit. This amendment modifies the Reclamation Plan (Exhibit E) and Reclamation <br />Costs (Exhibit L) based on a recent clarification of the Pueblo County Special Use Permit for this facility. <br />A copy of the Memorandum, dated June 8, 2011, is enclosed. <br />Additionally, this amendment updates the cement plant site plan and transmits copies of as -built <br />drawings. The addition and modification of structures has not resulted in any changes to the Permit <br />Boundary. <br />Enclosed are the following: <br />1. GCC's check in the amount $2,229 to cover the permit amendment fee. <br />2. One original and four copies of: <br />a. The completed and notarized Construction Material Regular (112) Operation Permit <br />Package (original with signatures in blue ink). <br />b. Amended Exhibits E and L, new Exhibit C -3 -1 (Cement Plant Site Plan Addendum) and <br />as -built drawings. <br />c. Proof of delivery of Notice of Filing Application to the Pueblo County Board of County <br />Commissioners and the South Pueblo County Conservation District. <br />d. Addendum 1 — Notice Requirements to comply with the provisions of Rule 1.6.2(1)(b) for <br />posting a notice at the site location. <br />Please contact me if you have any questions about this permit application. If I am unavailable, please <br />contact Ms. Barbara Hodgson at (719) 647 -6829 or bhodgson @gcc.com. <br />GCC Rio Grande, Inc. • Pueblo Plant <br />3372 Lime Road • Pueblo, CO 81004 <br />(719) 647 -6800 • Fax (719) 647 -6899 <br />Sincerely, <br />ance <br />ht Manager <br />June 29, 2011 <br />JU 302011 <br />Division d , e , , <br />Mining and safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.