Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil is approximately 6° deep. Access and drilling sites will be on existing tracks and <br />drilling rig access. There will be no topsoil removed_ <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />See Attachment A <br />10. Describe how portals, edits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />There will be no excavations made. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />• • _ • • - . - • • _ • • - _ • • <br />• •• _ • _ • - • • <br />condition. If roads are degraded that were originally old exploration tracks. they will be <br />harrowed and seeded with the approved seed mixture. If tracks are degraded that are <br />used by the public (for hunting access ?) they will be repaired and graded to <br />pr W upUrdtiur 1 al c,undiliv11. <br />