My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-09_REVISION - M1980146
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980146
>
2011-05-09_REVISION - M1980146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:24 PM
Creation date
6/29/2011 9:41:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
REVISION
Doc Date
5/9/2011
Doc Name
Cost summary form
From
DRMS
To
Montoya Pit
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Task # : 107 <br />Date : 05/09/2011 <br />User : RCO <br />Permit or other job action :Amendment 4 <br />EQUIPMENT TRANSPORT RIG COST <br />Task description :Haul reclamation equipment to and from site - only BLM <br />Truck tractor description :Generic on- highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0 -25 Tons 26 -50 Tons 51+ Tons <br />Cost Breakdown : <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />County :La Plata <br />$16.63 <br />$44.38 <br />$27.66 <br />$0.00 <br />$88.67 <br />$18.37 <br />$46.13 <br />$27.66 <br />$25.39 <br />$117.55 <br />NON - ROADABLE EQUIPMENT <br />Machine Weight/unit <br />Description (Tons) <br />- Cat DIOR - 10SU (2005) <br />- Reveg equipmt <br />-Weed spray equipmt <br />Ownership cost/hour <br />Operating cost/hour : <br />Operator cost/hour : <br />Helper cost/hour : <br />Total Unit Cost/hour : <br />Ownership <br />Cost/hr /unit <br />State :Colorado <br />Site :Montoya Pit <br />Haul Rig <br />Cost/hr /unit <br />Fleet Size <br />(No. units) <br />Permit/job # :M-1980-146 <br />Abbreviation :none <br />Filename :M146 -107 <br />IV <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />92.16 <br />6.00 <br />5.00 <br />$68.88 <br />$10.00 <br />$10.00 <br />$125.45 <br />$88.67 <br />$88.67 <br />1 <br />1 <br />1 <br />Subtotals : <br />$194.33 <br />$98.67 <br />$98.67 <br />$391.67 <br />$125.45 <br />$88.67 <br />$88.67 <br />$302.79 <br />Haul Trip <br />Cost/hr /fleet <br />$22.33 <br />$50.07 <br />$27.66 <br />$25.39 <br />$125.45 <br />Return Trip <br />Cost/hr /fleet <br />sheet 1 of 2 <br />DOT permit <br />Cost/fleet <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.