Laserfiche WebLink
ADJUSTED COSTS <br />Acquisition cost : <br />Econ.life -Dozer and ROPS : <br />- Attachment no. 2 : <br />Annual usage : <br />Double shifts : <br />Triple shifts : <br />Mechanic labor -Dozer and ROPS : <br />- Attachment no. 2 : <br />Fuel /lube -Dozer and ROPS : <br />Attachment no. 2 : <br />Depreciation <br />Ownership Costs <br />CFC <br />Overhead <br />$29.38 <br />$29.38 <br />NA <br />$44.33 <br />$33.25 <br />$29.57 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$23.50 <br />$11.75 <br />$7.83 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$21.93 <br />$10.97 <br />$7.30 <br />NA <br />NA <br />NA <br />NA <br />Overhaul <br />Labor Parts <br />Overhaul and Operating Costs sheet 2 of 2 <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />NA <br />$8.99 <br />$1.32 <br />NA <br />NA <br />NA <br />. $5.25 <br />$0.77 <br />NA <br />NA <br />NA <br />$29.36 <br />$2.47 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$10.52 <br />$2.41 <br />NA <br />NA <br />NA <br />$6.14 <br />$1.41 <br />NA <br />NA <br />NA <br />$28.60 <br />$2.49 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$44.20 <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$10.61 <br />$0.64 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />$4.14 <br />$2.07 <br />ADJUSTED COST SUBTOTALS <br />Dozer, ROPS and Attachment no. 2 : <br />Single shifts : <br />Double shifts : <br />Triple shifts : <br />Depreciation <br />Ownership Costs <br />CFC <br />Overhead <br />$44.33 <br />$33.25 <br />$29.57 <br />$23.50 <br />$11.75 <br />$7.83 <br />$21.93 <br />$10.97 <br />$7.30 <br />Overhaul and Operating Costs <br />Overhaul Field Repair <br />Labor I Parts Labor I Parts Fuel Lube I Tires I G.E.C. <br />Dozer and ROPS : <br />$5.25 <br />$0.77 <br />$29.36 <br />$2.47 <br />$6.14 <br />$1.41 <br />$28.60 <br />$2.49 <br />$44.20 <br />$0.00 <br />$10.61 <br />$0.64 <br />$0.00 <br />$4.14 <br />Attachment no. 2 : <br />$0.00 <br />$2.07 <br />HOURLY OPERATOR WAGES <br />Dozer operator (< 70hp) <br />Dozer operator( > =70hp) <br />Mechanic <br />Base <br />Rate <br />$23.67 <br />$23.67 <br />$16.74 <br />Fringe <br />Benefits <br />$9.22 <br />$9.22 <br />$4.20 <br />F.I.C.A. <br />7.65% <br />$1.81 <br />$1.81 <br />$1.28 <br />Unempl. <br />6.20% <br />$1.47 <br />$1.47 <br />$1.04 <br />Wk.Comp. <br />10.00% <br />$2.37 <br />$2.37 <br />$1.67 <br />Total <br />($ /hr) <br />$38.54 <br />$38.54 <br />$24.93 <br />Shift Differential <br />Day: <br />Swing : <br />Night: <br />$0.00 <br />$0.30 <br />$0.45 <br />Colorado labor zone : 2 <br />Two shift per day average : <br />Three shift per day average : <br />$0.15 <br />$0.25 <br />HOURLY EQUIPMENT COST SUMMARY <br />Single shifts : <br />Double shifts : <br />Triple shifts : <br />Ownership <br />$89.77 <br />$55.96 <br />$44.70 <br />Operating and Overhaul <br />Machine Attachments <br />$128.30 <br />$128.30 <br />$128.30 <br />$9.84 <br />$9.84 <br />$9.84 <br />Operator <br />$38.54 <br />$38.69 <br />$38.79 <br />Total <br />Cost/hr($) ' <br />$266.45 <br />$232.80 <br />$221.63 <br />EQUIPMENT PERFORMANCE DATA <br />Dozer : <br />Blade : <br />Attachment no. 1 : <br />Attachment no. 2 : <br />Description <br />Cat DIOR - 10SU (2005) <br />Semi - Universal <br />ROPS Cab <br />3 -shank ripper <br />Horsepower <br />(FHP) <br />570 <br />NA <br />NA <br />NA <br />Transmission <br />Type <br />NA <br />NA <br />NA <br />NA <br />Total weight <br />Weight <br />(UST) <br />72.1 <br />11.3 <br />NA <br />8.8 <br />92.2 <br />Length <br />(ft) <br />25.4 <br />NA <br />NA <br />4.3 <br />(UST) <br />Width <br />(ft) <br />10.3 <br />15.9 <br />NA <br />8.7 <br />Height <br />(ft) <br />14.2 <br />6.9 <br />NA <br />2.9 <br />Fuel <br />type <br />diesel <br />NA <br />NA <br />NA <br />Ripper <br />type <br />NA <br />NA <br />NA <br />Adj. Parallelogram <br />